My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tastad Construction 8/18/2022
>
Contracts
>
Capital Contract
>
Tastad Construction 8/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 10:39:41 AM
Creation date
8/19/2022 3:26:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tastad Construction
Approval Date
8/18/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Brad Chenoweth
Subject / Project Title
Silver LakeTrail Project
Public Works WO Number
PW-2022-075
Tracking Number
0003458
Total Compensation
$873,705.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Change Order 1 Tastad Construction
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Tastad Construction 6/27/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 00 63 25 - 1 <br /> 1 <br /> SECTION 00 63 25 - SUBSTITUTION REQUEST FORM <br /> PROJECT: Silver Lake Trail <br /> ' REQUEST NO.: <br /> CONTRACTOR: DATE: <br /> We hereby submit for consideration, following product instead of specified item for above <br /> project: <br /> Section Specified Item <br /> Proposed Substitution <br /> Attach complete technical data, including laboratory tests, and samples, as applicable. <br /> Attach detailed comparison of the significant qualities (size, weight, durability, performance and <br /> similar characteristics, and including visual effect where applicable) for the proposed <br /> substitution in comparison with the original requirements. <br /> List complete installation changes and changes to Drawings and Specifications required by <br /> ' proposal. <br /> Fill in Blanks Below: <br /> A. Does substitution require change in Drawing dimensions? <br /> B. Will Undersigned pay for resulting building design changes including engineering and <br /> detailing costs? <br /> C. What effect does substitution have on other trades? <br /> D. Differences between proposed substitution and specified item? <br /> 1 E. Manufacturer's guarantees of proposed and specified items are: <br /> Same Different (Explain on attachment) <br /> ' F. Name and address of three (3) similar projects on which product was used, and date of <br /> installation <br /> I <br /> G. Contract completion date is: Same Different (Explain on attachment). <br /> H. Cost Savings? <br /> 00 63 25 - 1 SUBSTITUTION REQUEST FORM <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.