My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tastad Construction 8/18/2022
>
Contracts
>
Capital Contract
>
Tastad Construction 8/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 10:39:41 AM
Creation date
8/19/2022 3:26:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tastad Construction
Approval Date
8/18/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Brad Chenoweth
Subject / Project Title
Silver LakeTrail Project
Public Works WO Number
PW-2022-075
Tracking Number
0003458
Total Compensation
$873,705.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Change Order 1 Tastad Construction
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Tastad Construction 6/27/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 68 00 - 2 <br /> 1 <br /> 2.3.1 For each hour spent in the performance of manual or physical labor if it is for <br /> more than twenty percent but less than fifty percent of their hours worked on a ' <br /> public works project during any given week. <br /> 2.3.2 For all hours worked in any given week if they perform manual or physical labor <br /> for fifty percent or more of their hours worked on a public works project during <br /> such week. <br /> 3. SUBCONTRACTORS <br /> The Contractor shall include the apprentice utilization requirements of this Specification 006800 1 <br /> in all subcontracts executed for the Project, and ensure that all subcontractors working on the <br /> Project are notified of the apprentice utilization requirements. The Contractor is responsible for <br /> using good faith efforts to meet the apprentice utilization requirements of the Contract, including <br /> overall compliance on all contract labor hours worked by subcontractors. <br /> 4. CHANGES TO THE APPRENTICE UTILIZATION REQUIREMENT <br /> 4.1 If the Contractor determines during the term of the Contract that it will be unable to meet I <br /> the apprentice utilization goal, the Contractor must ask the City in writing to modify the <br /> goal. The request shall include documentation of the Contractor's affirmative efforts to <br /> use apprentices registered with the Washington State Apprenticeship and Training <br /> Council ("SAC"), including copies of correspondence between the Contractor and the <br /> SAC approved apprentice programs, union locals, FAST Jobs Coalition, and others. <br /> 4.2 Bases for modification of goal include, but are not limited to: <br /> 4.2.1 A lack of availability of apprentices; <br /> 4.2.2 A disproportionately high ratio of material costs to labor hours, which does not <br /> make feasible the required minimum levels of apprentice participation; ' <br /> 4.2.3 Participating contractors have demonstrated a good faith effort to comply with the <br /> requirements of this resolution; or <br /> 4.2.4 Other criteria deemed appropriate by the City in its sole discretion. 1 <br /> 4.3 City shall evaluate the request, and if appropriate, a change order shall be prepared by <br /> City authorizing modification of the apprentice utilization goal. If City determines that a <br /> modification is not justified, City shall communicate the decision in writing to the <br /> Contractor. <br /> I <br /> 00 68 00 - 2 APPRENTICE UTILIZATION AND REPORTING <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.