My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11625 AIRPORT RD SONRISE CHRISTIAN CENTER 2022-08-25
>
Address Records
>
AIRPORT RD
>
11625
>
SONRISE CHRISTIAN CENTER
>
11625 AIRPORT RD SONRISE CHRISTIAN CENTER 2022-08-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 7:40:35 AM
Creation date
8/24/2022 4:42:09 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11625
Tenant Name
SONRISE CHRISTIAN CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring <br /> Monitoring shall be conducted annually for five years in accordance with the approved Buffer <br /> Enhancement Plan. The monitoring period will begin once the City receives written notification <br /> from a wetland professional confirming the mitigation plan has been implemented and City staff <br /> inspects the site and issues approval of the installation. <br /> Vegetation Monitoring <br /> Sampling points or transects will be established for vegetation monitoring and photo points will <br /> be established from which photos will be taken throughout the monitoring period. Permanent <br /> sampling points must be identified on the mitigation site plans in the first monitoring report (they <br /> may be drawn on approved enhancement plans by hand). Each sampling point shall detail shrub <br /> and tree coverage. Monitoring of vegetation sampling points shall occur annually between May <br /> 15 and September 30 (prior to leaf drop), unless otherwise specified. <br /> Photo points <br /> At least one permanent photo point will be established within the enhancement area. <br /> Photographs will be taken from photo points to visually record condition of the enhancement <br /> area. Photos shall be taken annually between May 15 and September 30 (prior to leaf drop), <br /> unless otherwise specified. <br /> Monitoring Reports <br /> Monitoring reports shall be submitted in the fall of each year during the monitoring period. As <br /> applicable, monitoring reports must include descriptions / data for: <br /> 1) Site plan and vicinity map; <br /> 2) Historic description of project, including date of installation, current year of <br /> monitoring, restatement of mitigation / restoration goals, and performance standards; <br /> 3) Plant survival, vigor, and areal coverage (transect or sampling point data), and <br /> explanation of monitoring methodology in the context of assessing performance <br /> standards; <br /> 4) Assessment of nuisance / exotic biota and recommendations for management; <br /> 5) Color photographs taken from permanent photo-points that shall be depicted on the <br /> monitoring report map. <br /> 3.4.3 Project Success and Compliance <br /> Performance Standards <br /> The buffer enhancement area must achieve the following Performance Standards to be <br /> considered successful: <br /> Year 1 Year 3 Year 5 <br /> Survivorship* 100% 80% 80% <br /> Native plant cover** 30% 50% 80% <br /> Invasive species cover <10% <10% <10% <br /> *Only applies to installed native plantings. <br /> **Native volunteer species may be included to meet native species cover requirements. <br /> Sonrise Christian Center 13 Critical Areas Study,Buffer Averaging, <br /> March 2,2018 &Buffer Enhancement Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.