Laserfiche WebLink
1 <br /> MR#6 RUNOFF TREATMENT: Water quality for the site will be provided by a <br /> bioretention upstream of detention. <br /> MR#7 FLOW CONTROL: Flow control requirements will be met by an underground R <br /> tank(36.75-ft by 145.75-ft by 3.54-ft)which will be located within the parking lot. The R <br /> 1 tank will provide a total storage capacity of 18,006 CF. <br /> MR#8 WETLANDS PROTECTION: The site contains a wetland of 0.77 Acres with <br /> ' associated buffer. <br /> MR#9 OPERATIONS AND MAINTENANCE: An Operation and Maintenance <br /> Manual will be handed in as a separate document. <br /> 1 <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> i <br /> 1 <br /> Insight Engineering Co. -Stormwater Site Plan 12/20/2018 <br /> -6- <br />