Laserfiche WebLink
I <br /> SECTION II: SITE ASSESSMENT <br /> Based on the site reconnaissance and the available topography we have the following info: <br /> • Topography: The clearing area slopes moderately to the southwest. Refer to the <br /> grading plan for more details. <br /> • Drainage: The site contains one existing drainage that drains to the southwest of the <br /> site. <br /> • Soils: Per NRCS survey of Snohomish County, the project site contains Alderwood <br /> gravelly sandy loam, 0 to 8 percent slopes. Refer to the attached soil map later in <br /> this report. <br /> • Ground Cover: The entire site is currently vacant. <br /> • Critical areas: There is a critical area located within the site. <br /> • The property access is from Sonrise Christian Center. <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Insight Engineering Co. -Stormwater Site Plan 12/20/2018 <br /> -7- <br /> 1 <br />