Laserfiche WebLink
1 <br /> 111 B. PRE-DEVELOPED HYDROLOGY <br /> I <br /> The site contains 1.88 Acres. The site is currently vacant with access from Sonrise <br /> Christian Center. The remainder of the site exists as lawn and native vegetation. The site <br /> contains one drainage basin that that slopes moderately to the south west. Please refer to <br /> the downstream analysis map for more details. Per NRCS survey of Snohomish County, the <br /> project site contains Alderwood soils that have a hydrologic classification of Type "C". <br /> Please refer to the soils map and descriptions attached later in this report for more details. <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> Insight Engineering Co. -Stormwater Site Plan 12/20/2018 <br /> -20- <br />