Laserfiche WebLink
1 <br /> C. DEVELOPED HYDROLOGY <br /> I <br /> The proposal is to construct a parking lot facility. The access to the site will from <br /> the Sonrise Christian Center.Flow control requirements will be met by an underground R <br /> tank(36.75-ft by 145.75-ft by 3.54-ft) which will be located within the parking lot. The R <br /> tank will provide a total storage capacity of 18,006 CF. Water quality for the site will be <br /> provided by a bioretention upstream of detention. The outlet from the R tank will be <br /> connected to the wetland on the western portion of the site. <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 Insight Engineering Co. -Stormwater Site Plan 12/20/2018 <br /> -21 - <br /> II <br />