Port of Everett—South Terminal Wharf& Electrical Upgrades—Phase 2 125 <br /> Table 21 — WEAP Analysis Results for APE D100-52 Hammer <br /> Allow. APE D100-42 Hammer <br /> Pile <br /> Compressive <br /> Pile Rows Diameter Max Compressive Max Blows per <br /> Resistance <br /> (in) Stress (ksi) Foot <br /> (kip) <br /> A,B,C 18 265 39.1 7 <br /> A' 24 360* 44.4 10 <br /> D,E 18 305 44.4 11_ <br /> • <br /> F,G,G' 24 660 44.7 32 <br /> *Maximum allowable compressive resistance corresponding to compressive stress less than 45 ksi(0.9*Fy)for <br /> selected hammer. <br /> Additional Considerations.The output produced by the wave equation analyses depends on the pile, <br /> hammer, and soil input parameters.We selected input parameters based nearby field explorations, <br /> laboratory tests, previous pile driving and dynamic testing,and manufacturer-supplied hammer <br /> information.Actual field conditions, project requirements, and hammer type and performance may vary <br /> from what we have assumed;therefore,the actual drivability and driving stresses may differ from those <br /> presented above. <br /> Our analyses did not include possible effects of pile installation such as interruptions to driving and <br /> subsequent pile setup. Our assessment assumed an equal distribution of the total resistance between the <br /> pile toe and shaft. Instances in which the piles are primarily end bearing may result in increased <br /> compressive stresses than our calculations predict. Given the high stresses computed for the pile loads, it <br /> is critical that field observation of the piles with the PDA occur.Additionally,the driving stresses computed <br /> by the GRLWEAP program do not include stresses that might result from bending or torsion. For best <br /> driving performance, it will be important for the contractor to adequately prepare the pile top for driving, <br /> use a pile helmet that fits the pile, and maintain the vertical alignment of the hammer, cushions, helmet, <br /> and pile. <br /> Monitoring During Pile Driving <br /> Pile driving stresses can be measured indirectly in the field using a PDA or estimated using a wave equation <br /> computer program such as WEAP. We recommend that pile installation monitoring activities include the <br /> following: <br /> • Verify adequacy of the hammer, cushion, and cap block before beginning driving with a drivability <br /> analysis completed by the Contractor and reviewed the by the Port's Geotechnical Engineer, <br /> • Ensure proper pile handling before driving, <br /> • Record the hammer operating characteristics such as fuel setting,stroke, and hammer blows per <br /> minute, <br /> • Record the hammer blows per foot of pile penetration, <br /> 1.� 19232-01 <br /> H/ARTCROwSER December 6,2017 <br />