26 I Port of Everett—South Terminal Wharf&Electrical Upgrades—Phase 2 <br /> • Optically survey movement and monitor vibration of settlement-sensitive structures when driving piles <br /> nearby, <br /> • Monitor movement of adjacent piles when driving piles nearby;and <br /> • Provide PDA along with CAPWAP analysis for selected piles.We recommend performing dynamic <br /> testing on at least 5 percent of production piles and including at least one pile from each row along the <br /> slope.The first piles driven should be instrumented with the PDA to immediately assess the <br /> performances of the pile driving system. <br /> A suitable approach(such as the use of S.equation described above)should be developed to assess and <br /> verify pile capacity using the blow count observed during pile driving. Capacity during initial pile driving is <br /> typically less than the final static capacity.This occurs because: <br /> • In granular soil (sand),the vibrations from pile driving induce liquefaction in the nearby soil, reducing <br /> the shear strength;and <br /> • In cohesive soil (clay),the soil is remolded during driving. Remolded soil strengths are generally less <br /> than undisturbed soil strengths. <br /> These strength losses during initial driving are usually regained following installation; rapidly for granular <br /> soil (within several days), but more slowly for cohesive soil (weeks to months).The pile axial resistance <br /> values recommended on Figures 22 through 27 are representative of conditions after the strength losses <br /> during initial driving have been regained.We would recommend instrumented restrikes on a series of test <br /> piles at the beginning of driving with planned restrikes of 40-hours and, if needed,a second restrike 7-days <br /> later to assess geotechnical capacity.Alternatively,the piles could likely be driven slightly deeper such that <br /> the geotechnical capacity within 40-hours of driving is adequate for the required loading. <br /> Utilities <br /> In general,we recommend that utility trench cut design be the contractor's responsibility. For shallow <br /> trench excavations less than 4 feet deep,open cutting is not prohibited. In general,the on-site soils are <br /> OSHA Type C soil.Temporary shoring may be necessary if deeper excavation is required for utility <br /> placement, if the soils are unstable,and if room does not allow for a safe slope to be established.The <br /> contractor should verify the condition of the side slopes during construction,and lay back trench cuts as <br /> necessary to conform to current standards of practice.We can provide additional recommendations as <br /> required. <br /> Foundation Support for Underground Civil Structures <br /> The following foundation recommendations cover design and construction of proposed utility vaults: <br /> • Use a maximum allowable bearing pressure of 2,000 pounds per square foot(ksf). <br /> • For utility vaults bearing below design groundwater elevation,design for an uplift pressure of 400 psf. <br /> 19232-01 IN <br /> December 6,2017 HAWSER <br />