Laserfiche WebLink
0 <br /> Comment Response Letter PE RTE ET <br /> 2707 Colby Avenue,Suite 900,Everett,WA 98201 I P 425.252.7700 I F 425.339.6018 <br /> iii. The project will be required to evaluate stormwater in accordance with the Minimum <br /> Requirements within the 2010 Stormwater Management Manual <br /> iv. Please turn in 2 copies of the completed drainage report with your resubmittal and revise the <br /> drainage plan as necessary to comply with the stormwater mitigation required after <br /> evaluation(there may be no change,but it is required to be evaluated based on the minimum <br /> requirements triggered). <br /> Response: See attached Stormwater Management Questionnaire, which the City gave Perteet <br /> permission to use on 11/21/2019 (after these comments were provided by the city). <br /> Page 4 If <br /> File location:X:\Imagine Children's Museum\Projects\20170263-!ma ine€-titch-n'S Museum Exp Ph 4\Submittals\Comment Response Letter.docx <br />