Laserfiche WebLink
• <br /> PERTEET <br /> Comment Response Letter <br /> 2707 Colby Avenue,Suite 900,Everett,WA 98201 I P 425.252.7700 I F 425.339.6018 <br /> modified city standards (See sheet TS1), or replaced with city standard sidewalk and curb <br /> heights. Museum shown instead of parking lot. <br /> h. SW1—The ramp in front of the lobby but in the right of way is unacceptable. The City does not allow <br /> ramping or other structure improvemetns in the right of way. This ramp must be removed from the <br /> frontage,and if necessary,shall be designed inside the building in the lobby. We have discussed this <br /> issue with the Public Works Director and the ramp will not be permitted. We will allow the crane <br /> structure to remain., although caution that some type of clear barrier would be a good idea to be <br /> added to avoid liability risks with potential accidents from kids climbing the structure. The sidewalk in <br /> this area is required to have a minimum of 6' clear pedestrian travel width with no obstructions. <br /> Another reason we cannot allow the ramp is that it does not provide this required sidewalk travel width <br /> behind the driveways. Please revise the frontage as necessary to comply with City requirements. <br /> Response:Architect has had discussions with Public Works Director Ryan Sass,and expressed <br /> to Perteet that through those conversations gained permission to have ramp within the sidewalk. <br /> Because the driveway adjacent to the ramp is being removed,there will be adequate travel space <br /> for pedestrians who are not using the ramp. <br /> i. SW1&TS1—Call out driveways per City Standard Drawing number and Type. The Detail shall be the <br /> City's standard driveway type. Show grades on SW1 for constructability of anything that will be new <br /> for construction of this project (post construction of Rucker Renewal Project). Response: City <br /> standards not used outright,since city standards show planter adjacent to the ramp,and in this <br /> case driveway is adjacent to sidewalk. TS1 shows this deviation in our detail,and the detail also <br /> references city standard 317 in the notes. Grades for Sidewalk and Driveways are shown on the <br /> grading plans so as not to crowd sheets. <br /> j. GP1-Grading plan shall show grades for right-of-way sidewalk/driveway/curb construction. Since the <br /> ramps are not permitted in the right of way,please remove this background and grading information <br /> and add grades that are applicable for constructability of any frontage work that is proposed after the <br /> Rucker Renewal project. Response:grading plans updated to reflect frontage sans ramps. <br /> k. UT1-[update] proposed project background on all sheets including this sheet (parking lot and <br /> frontage improvements)to show the proposed condition. Add a sewer cleanout to the side sewer and <br /> label the size,material,and slope of the pipe. The Label for connecting the side sewer to the main is <br /> incorrect. It may be a combined sewer,but it is not a CSO (combined sewer outfall). Eliminate this <br /> work and just have the note read "connect to sanitary sewer". Response: Background revised as <br /> requested,pipe slope not included since SS main elevation is not available. To be field fit during <br /> construction. <br /> 3) The comments below were generated from this projects Stormwater Reviewer. If you have any questions please <br /> contact Amie Roshak with the City of Everett Surface Water Department (425-257-7249 or <br /> ARosha kOeverettwa.gov) <br /> a. Stormwater shall be managed in accordance with City of Everett Stormwater Management <br /> Standards current at the time the public works/building permit application package is submitted for <br /> the city to review. <br /> i. This project is in the combined storm/sewer area. Currently, the Stormwater code for this <br /> area is the City's 2010 Stormwater Management Manual along with Interim Policy 2-11. <br /> ii. Chapter 4 of the City's Design and Construction Standards and Specifications for <br /> Development manual contains the City's stormwater Standards. <br /> Page 3`��r-F� <br /> File location:X:\Imagine Children's Museum\Projects\20170263-Im e ildren's Museum Exp Ph 4\Submittals\Comment Response Letter.docx <br />