My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1502 WALL ST IMAGINE CHILDRENS MUSEUM 2022-08-25
>
Address Records
>
WALL ST
>
1502
>
IMAGINE CHILDRENS MUSEUM
>
1502 WALL ST IMAGINE CHILDRENS MUSEUM 2022-08-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 4:22:03 PM
Creation date
8/25/2022 2:14:52 PM
Metadata
Fields
Template:
Address Document
Street Name
WALL ST
Street Number
1502
Tenant Name
IMAGINE CHILDRENS MUSEUM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 2: Establish Construction Access (2.1.2) <br /> Describe how you will minimize dust generation and vehicles tracking sediment off-site. <br /> Limit vehicle access to one route, if possible. <br /> Recycled concrete used to establish construction ingress or egress may be a stormwater <br /> pollutant source that requires treatment prior to discharge. <br /> Street sweeping, street cleaning, or wheel wash/tire baths may be necessary if the stabilized <br /> construction access is not effective. All wheel wash wastewater shall be controlled on-site and <br /> CANNOT be discharged into waters of the State. <br /> Install site ingress/egress stabilization BMPs according to BMP C105. <br /> Describe how you will clean the affected roadway(s)from sediment which is tracked off-site. <br /> Construction access or activities occurring on unpaved areas shall be minimized, yet where <br /> necessary, access points shall be stabilized to minimize the tracking of sediment onto public <br /> roads, and wheel washing, street sweeping, and street cleaning shall be employed to prevent <br /> sediment from entering state waters. All wash wastewater shall be controlled on site. The <br /> specific BMPs related to establishing construction access that will be used on this project <br /> include: <br /> BMP C107: Construction Road/Parking Area Stabilization <br /> Alternate construction access BMPs are included in Appendix B as a quick reference tool for the <br /> onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate <br /> during construction to satisfy the requirements set forth in the General NPDES Permit Appendix <br /> E). To avoid potential erosion and sediment control issues that may cause a violation(s) of the <br /> NPDES Construction Stormwater permit (as provided in Appendix E), the Certified Erosion and <br /> Sediment Control Lead will promptly initiate the implementation of one or more of the alternative <br /> BMPs listed in Appendix B after the first sign that existing BMPs are ineffective or failing. <br /> Installation Schedules: [Insert text here] <br /> Inspection and Maintenance plan: [Insert text here] <br /> Responsible Staff: [Insert text here] <br />
The URL can be used to link to this page
Your browser does not support the video tag.