Laserfiche WebLink
Element 3: Control Flow Rates (2.1.3) <br /> Describe how you will protect properties and waterways downstream of the project from <br /> increased speed and volume of stormwater discharges due to construction activity. <br /> Construction of stormwater retention and/or detention facilities must be done as one of the first <br /> steps in grading. <br /> Assure that detention facilities are functioning properly before constructing site improvements <br /> (i.e. impervious surfaces). <br /> If applicable, describe how you will protect areas designed for infiltration from siltation during the <br /> construction phase. <br /> Will you construct stormwater retention and/or detention facilities? <br /> Yes No <br /> Will you use permanent infiltration ponds or other low impact development (example: rain <br /> gardens, bio-retention, porous pavement) to control flow during construction? <br /> Yes No <br /> No BMPs are applicable for the proposed project. <br /> Installation Schedules: [Insert text here] <br /> Inspection and Maintenance plan: [Insert text here] <br /> Responsible Staff: [Insert text here] <br />