My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1502 WALL ST IMAGINE CHILDRENS MUSEUM 2022-08-25
>
Address Records
>
WALL ST
>
1502
>
IMAGINE CHILDRENS MUSEUM
>
1502 WALL ST IMAGINE CHILDRENS MUSEUM 2022-08-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 4:22:03 PM
Creation date
8/25/2022 2:14:52 PM
Metadata
Fields
Template:
Address Document
Street Name
WALL ST
Street Number
1502
Tenant Name
IMAGINE CHILDRENS MUSEUM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring and Sampling Requirements (4.0) <br /> Monitoring includes visual inspection, sampling for water quality parameters of concern, and <br /> documentation of the inspection and sampling findings in a site log book. A site log book will be <br /> maintained for all on-site construction activities and will include: <br /> • A record of the implementation of the SWPPP and other permit requirements <br /> • Site inspections <br /> • Stormwater sampling data <br /> Create your own Site Inspection Form or use the Construction Stormwater Site Inspection Form <br /> found on Ecology's website. https://www.ecology.wa.gov/Regulations-Permits/Permits- <br /> certifications/Stormwater-general-permits/Construction-Stormwater-permit <br /> File a blank form under Appendix D. <br /> The site log book must be maintained on-site within reasonable access to the site and be made <br /> available upon request to Ecology or the local jurisdiction. <br /> Numeric effluent limits may be required for certain discharges to 303(d) listed waterbodies. See <br /> CSWGP Special Condition S8 and Section 5 of this template. <br /> Complete the following paragraph for sites that discharge to impaired waterbodies for fine <br /> sediment, turbidity, phosphorus, or pH: <br /> The receiving waterbody, Possession Sound (North), is impaired for: Benzo(a)anthracene, <br /> Benzo(b)fluoranthene, Benzo(k)fluoranthene, Chrysene, 2,3,7,8-TCDD (Dioxin), and Sediment <br /> Bioassay. All stormwater and dewatering discharges from the site are subject to an effluent <br /> limit of 8.5 su for pH and/or 25 NTU for turbidity. <br /> Site Inspection (4.1) <br /> Site inspections will be conducted at least once every calendar week and within 24 hours <br /> following any discharge from the site. For sites that are temporarily stabilized and inactive, the <br /> required frequency is reduced to once per calendar month. <br /> The discharge point(s) are indicated on the Site Map (see Appendix A) and in accordance with <br /> the applicable requirements of the CSWGP. <br /> Stormwater Quality Sampling (4.2) <br /> Turbidity Sampling (4.2.1) <br /> Requirements include calibrated turbidity meter or transparency tube to sample site discharges <br /> for compliance with the CSWGP. Sampling will be conducted at all discharge points at least <br /> once per calendar week. <br /> Method for sampling turbidity: <br />
The URL can be used to link to this page
Your browser does not support the video tag.