My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1502 WALL ST IMAGINE CHILDRENS MUSEUM 2022-08-25
>
Address Records
>
WALL ST
>
1502
>
IMAGINE CHILDRENS MUSEUM
>
1502 WALL ST IMAGINE CHILDRENS MUSEUM 2022-08-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 4:22:03 PM
Creation date
8/25/2022 2:14:52 PM
Metadata
Fields
Template:
Address Document
Street Name
WALL ST
Street Number
1502
Tenant Name
IMAGINE CHILDRENS MUSEUM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Check the analysis method you will use: <br /> Table 8— Turbidity Sampling Method <br /> Turbidity Meter/Turbidimeter(required for disturbances 5 acres or greater in size) <br /> Transparency Tube (option for disturbances less than 1 acre and up to 5 acres in size) <br /> The benchmark for turbidity value is 25 nephelometric turbidity units (NTU) and a transparency <br /> less than 33 centimeters. <br /> If the discharge's turbidity is 26 to 249 NTU or the transparency is less than 33 cm but equal to <br /> or greater than 6 cm, the following steps will be conducted: <br /> 1. Review the SWPPP for compliance with Special Condition S9. Make appropriate <br /> revisions within 7 days of the date the discharge exceeded the benchmark. <br /> 2. Immediately begin the process to fully implement and maintain appropriate source <br /> control and/or treatment BMPs as soon as possible. Address the problems within 10 <br /> days of the date the discharge exceeded the benchmark. If installation of necessary <br /> treatment BMPs is not feasible within 10 days, Ecology may approve additional time <br /> when the Permittee requests an extension within the initial 10-day response period. <br /> 3. Document BMP implementation and maintenance in the site log book. <br /> If the turbidity exceeds 250 NTU or the transparency is 6 cm or less at any time, the following <br /> steps will be conducted: <br /> 1. Telephone or submit an electronic report to the applicable Ecology Region's <br /> Environmental Report Tracking System (ERTS) within 24 hours. <br /> https://www.ecology.wa.gov/About-us/Get-involved/Report-an-environmental-issue <br /> • Central Region (Benton, Chelan, Douglas, Kittitas, Klickitat, Okanogan, Yakima): <br /> (509) 575-2490 <br /> • Eastern Region (Adams, Asotin, Columbia, Ferry, Franklin, Garfield, Grant, <br /> Lincoln, Pend Oreille, Spokane, Stevens, Walla Walla, Whitman): (509) 329-3400 <br /> • Northwest Region (King, Kitsap, Island, San Juan, Skagit, Snohomish, <br /> Whatcom): (425) 649-7000 <br /> • Southwest Region (Clallam, Clark, Cowlitz, Grays Harbor, Jefferson, Lewis, <br /> Mason, Pacific, Pierce, Skamania, Thurston, Wahkiakum,): (360) 407-6300 <br /> 2. Immediately begin the process to fully implement and maintain appropriate source <br /> control and/or treatment BMPs as soon as possible. Address the problems within 10 <br /> days of the date the discharge exceeded the benchmark. If installation of necessary <br /> treatment BMPs is not feasible within 10 days, Ecology may approve additional time <br /> when the Permittee requests an extension within the initial 10-day response period <br /> 3. Document BMP implementation and maintenance in the site log book. <br /> 4. Continue to sample discharges daily until one of the following is true: <br /> • Turbidity is 25 NTU (or lower). <br /> • Transparency is 33 cm (or greater). <br />
The URL can be used to link to this page
Your browser does not support the video tag.