Laserfiche WebLink
From: Michael Brick <MBrick@everettwa.gov> <br />Sent: Monday, June 22, 2020 2:33 PM <br />To: Benyam Stephanos <BStephanos@everettwa.gov> <br />Cc: Sabrina Fandler <SFandler@everettwa.gov> <br />Subject: Re: 2202 100th Street S.W.(PW2004-012) <br />Benyam, <br />You did give me a set of plans and I went through them and everything looks OK except the required <br />accessible asphalt ramps to get the sidewalk back to road grade that are technically off their frontage. I'll go <br />back through the plans this afternoon and see if I missed that detail and confirm my comments before the end <br />of the day. <br />My family and I are all doing OK. The kids are excited that school is officially over for the summer (which I <br />think if funny since they've been home since March anyway) and we're making plans to go camping next <br />month if we can. Chelsey's work is still on furlough (she works on a mobile spay station and it's hard to figure <br />out social distancing when your work area is an RV turned into an operating room) so she's home full time <br />which has been good for the kids but she's going a little stir crazy. How are you doing? <br />Michael <br />From: Benyam Stephanos <BStephanos@everettwa.gov> <br />Sent: Monday, June 22, 2020 2:23 PM <br />To: Michael Brick <MBrick@eve rettwa.gov> <br />Cc: Sabrina Fandler <SFandler@everettwa.gov> <br />Subject: Re: 2202 100th Street S.W.(PW2004-012) <br />Hi! Michael <br />How are you? I thought I put the drawings on your desk did you review them? There are <br />Some details/drawings but I want you to see them they are a little not clear but see if they are ok. <br />If you don't have the drawings I will be coming tomorrow so I can get you a copy. <br />Thank you <br />Benyam <br />From: Michael Brick <MBrick@everettwa.gov> <br />Sent: Monday, June 22, 2020 7:28 AM <br />To: Benyam Stephanos <BStephanos@everettwa.gov> <br />Cc: Sabrina Fandler <SFandler@everettwa.gov> <br />Subject: Re: 2202 100th Street S.W.(PW2004-012) <br />Benyam, <br />I need to see details in the plans for the temporary transition ramps at the east and south ends of the sidewalk <br />improvements to bring pedestrians back down to grade where the sidewalk ends - if those details are included <br />somewhere that I missed in the plan set I have no other comments on the plans. I accept the traffic study as <br />submitted. This project will owe $19,200 in traffic mitigation fees if permits are issued this year. <br />