Subsurface Exploration, Geologic Hazard,and <br /> Stephens Everett Property Preliminary Geotechnical Engineering Report <br /> Everett, Washington Preliminary Design Recommendations <br /> Pavement areas should be prepared in accordance with the "Site Preparation" section of this <br /> report. If the stripped native soil or existing fill pavement subgrade can be compacted to <br /> 95 percent of ASTM D-1557 and is firm and unyielding, no additional overexcavation is <br /> required. Soft or yielding areas should be overexcavated to provide a suitable subgrade and <br /> backfilled with structural fill. The upper 2 feet of pavement subgrade should be recompacted <br /> to 95 percent of ASTM D-1557. If required, structural fill may then be placed to achieve desired <br /> subbase grades. <br /> Because the site soils were substantially above optimum moisture content and they generally <br /> contain large amounts of soil particles smaller than the U.S. No. 200 sieve, some remedial <br /> subgrade preparation may be required below the paving. Remedial preparation measures <br /> could include removal of some of the existing native soils below the planned pavement section <br /> and restoring the planned subgrade elevation with select imported structural fill, treating the <br /> native soil subgrade with powdered cement to stabilize the wet soils, or aeration and drying of <br /> existing soils prior to compaction of the road subgrades. We recommend that the final <br /> determination of how to prepare the road subgrades be made at the time of construction <br /> when weather and field conditions are known. <br /> We anticipate the interior parking lot and aisles will be subject to light traffic loads from <br /> passenger vehicles driving and parking. In these light traffic load areas, we recommend a <br /> pavement section consisting of 3 inches of hot-mix asphalt (HMA) underlain by 4 inches of <br /> crushed surfacing base course is the recommended minimum in areas of planned passenger car <br /> lanes and parking. Additionally, we anticipate that select areas of pavement onsite will <br /> encounter heavier loading from semi-trucks, fire trucks, and garbage trucks, along with <br /> passenger vehicles. In these heavy traffic areas, a minimum pavement section consisting of <br /> 4 inches of HMA underlain by 2 inches of crushed surfacing top course and 4 inches of crushed <br /> surfacing base course is recommended. The crushed rock will provide improved and consistent <br /> drainage, which will extend the service life of the parking lot.The crushed rock courses must be <br /> compacted to 95 percent of the maximum density, as determined by ASTM D-1557. All paving <br /> materials should meet gradation criteria contained in the current Washington State <br /> Department of Transportation (WSDOT) Standard Specifications. <br /> Depending on construction staging and desired performance, the crushed base course material <br /> may be substituted with asphalt treated base (ATB) beneath the final asphalt surfacing. The <br /> substitution of ATB should be as follows: 4 inches of crushed rock can be substituted <br /> with 3 inches of ATB, and 6 inches of crushed rock may be substituted with 4 inches of ATB. <br /> ATB should be placed over a native or structural fill subgrade compacted to a minimum <br /> of 95 percent relative density, and a 11/2- to 2-inch thickness of crushed rock to act as a working <br /> surface. If ATB is used for construction access and staging areas, some rutting and disturbance <br /> of the ATB surface should be expected. The general contractor should remove affected areas <br /> and replace them with properly compacted ATB prior to final surfacing. <br /> March 29,2019 ASSOCIATED EARTH SCIENCES,INC. <br /> TG/ms-180567E001-2-Projects120180567WE\WP Page 18 <br />