Laserfiche WebLink
`EVERETT <br />City Council Agenda Item Cover Sheet <br />Project title: An Ordinance Creating a Special Construction Project Entitled "Clark Park Gazebo Renovation", Fund <br />354, Program 078, to Accumulate Costs for the Project in the Amount of $30,000 <br />Council Bill # <br />CB 2208-37 <br />Agenda dates requested: <br />Briefing <br />Proposed action 8/17/2022 <br />Proposed action 8/24/2022 <br />Consent <br />Action 8/31/2022 <br />Ordinance <br />Public hearing <br />Yes X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Ordinance <br />Department(s) involved: <br />Parks & Facilities <br />Contact person: <br />Bob Leonard <br />Phone number: <br />425-257-8335 <br />Email: <br />bleonard@everettwa.gov <br />Initialed by: <br />2ML <br />Department head <br />Administration <br />Council President <br />Project: <br />Partner/Supplier: <br />Location: <br />Preceding action: <br />Fund: <br />Clark Park Gazebo Renovation <br />None <br />2400 Lombard Avenue, Everett, WA 98201 <br />None <br />Fund 354— Program 078 (CIP-3) <br />Fiscal summary statement: <br />The proposed Ordinance will fund the design for the Clark Park Gazebo upgrades and repairs to <br />the existing gazebo which will include an engineer's estimate for the project, in the amount of <br />$30,000. <br />Project summary statement: <br />The Gazebo has been identified as a centerpiece of Clark Park for generations and is beloved by <br />the Bayside neighborhood. It's location near downtown has provided residents with a place to <br />enjoy sunny summer days and bright fall foliage. Staff has identified structural deficiencies that <br />require major repairs to structural columns, fascia, roofing, railings, and failing foundation. <br />Additional work required will be to install a decorative sliding locked shutter system, an outward <br />opening full height locking double door, an ADA compliant ramp, and repairs to surrounding <br />landscape. These required repairs would allow reserved access to users and with features related <br />to the architecture of the gazebo. <br />The gazebo would be further utilized, especially during the summer months to host community <br />outings. Residents routinely fill up the space with themed decorations to different holidays. <br />Architectural and engineering services will provide plans and specifications necessary to convey <br />the scope of work to bidding contractors. <br />Upon completion of the design plans, specifications, and engineer's estimate. Staff will return <br />and amend the Ordinance to capture all project costs. <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a special construction project entitled "Clark Park Gazebo <br />Renovation", Fund 354, Program 078, to accumulate costs for the project in the amount of <br />$30,000. <br />