Laserfiche WebLink
`EVERETT <br />City Council Agenda Item Cover Sheet <br />Our team will <br />introduce an <br />ordinance to <br />Council Bill # <br />CB — 2208-38 <br />An Ordinance Creating a Special Construction Project Entitled "Forest Park Spray Pad Recirculation <br />Project", Fund 354, Program 079, to Accumulate Costs for the Project in the Amount of $60,000 <br />Agenda dates requested: <br />Briefing <br />Proposed action 8/17/2022 <br />Proposed action 8/24/2022 <br />Consent <br />Action 8/31/2022 <br />Ordinance X <br />Public hearing <br />Yes X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Ordinance <br />Department(s) involved: <br />Parks & Facilities <br />Contact person: <br />Bob Leonard <br />Phone number: <br />425-257-8335 <br />Email: <br />bleonard@everettwa.gov <br />Initialed by: <br />RAIL <br />Department head <br />Administration <br />Council President <br />Project: <br />Partner/Supplier: <br />Location: <br />Preceding action: <br />Fund: <br />Forest Park Spray Pad Recirculation Project <br />None <br />802 East Mukilteo Blvd <br />None <br />Fund 354— Program 079 (CIP-3) <br />Fiscal summary statement: <br />The proposed Ordinance will fund the design to provide an upgrade to the current Forest Park <br />Spray Pad water pump and spray system. The upgraded design will include a revised <br />recirculation pump design which will include an engineer's estimate for the project, at a cost of <br />$60,000. Once the engineer's estimate is known, staff will return to amend this Ordinance to <br />capture the cost of the project. <br />Project summary statement: <br />The existing water from the Forest Park Spray Pad goes directly to the park's drainage system. <br />The goal of the project is to improve water conservation by reducing water consumption at the <br />spray park and to provide a new sanitizing water treatment system. To achieve this goal, the <br />spray park will convert the pumping system into a treated and recirculating system sending the <br />water back to the spray park features. Recirculating the water back to the spray park equipment <br />will significantly improve water conservation. The scope of work includes design and engineering <br />services, construction and bid documents, along with the creation of an engineer's estimate for <br />the costs to remove and replace the water supply system with a recirculating system. <br />Upon completion of the scope of work, plans, specifications, and engineer's estimate, staff will <br />return to Council to amend the Ordinance to capture the total project costs. <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a special construction project entitled "Forest Park Spray Pad <br />Recirculation Project", Fund 354, Program 079, to accumulate costs for the project in the amount <br />of $60,000. <br />