My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/08/31 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/08/31 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 9:46:16 AM
Creation date
9/1/2022 9:38:38 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/31/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Bridge Inventory will also be updated with the new load rating <br />information. <br />Assumptions <br />• TranTech will work from the as -built plans and the inventory inspection report to <br />provide the most accurate condition for the load rating calculations. Field visits will be <br />performed with the approval of the City if questions cannot be resolved through <br />consultation with City Bridge Inspectors or other City personnel. <br />• Existing load rating analysis will be reviewed and utilized to the fullest extent possible. <br />• Some existing load rating analysis may be of little or no use for the update process <br />requiring a complete re -rating. <br />• It is assumed that no substructure load rating will be performed. Should it be determined <br />that this additional evaluation is necessary due to deterioration of the substructure <br />elements, the City will be contacted for approve of the additional work. <br />Budget <br />Budget for this task is estimated at $68,094 and is provided in Exhibit B Compensation per <br />Hourly Rate to a Maximum Amount <br />Task 2 — Scour Evaluations <br />TRANTECH shall provide scour evaluations per WSDOT Bridge Scour Evaluation Fonn for <br />uploading into WSDOT Bridge Works for up to 5 City Bridges. <br />Assumptions <br />The activities in this task is limited to structures that their scour stability can be determined via <br />the WSDOT Bridge Scour Evaluation Form. <br />Budget <br />Budget for this task is estimated at $5,000 as provided in Exhibit B Compensation per Hourly <br />Rate to a Maximum Amount <br />The City of Everett Engineering On -call Services Page 3 <br />TRANTECH ENGINEERING <br />
The URL can be used to link to this page
Your browser does not support the video tag.