Laserfiche WebLink
Task 3 — Grand Ave Ped Bridge Inspection <br />This task is performed by TranTech's Subconsultant, Fickett Structural Solutions (Fickett). Their <br />scope of work entails inventory inspection and uploading inspection results within the WSDOT <br />Bridge Works software as provided in Exhibit A. <br />Budget <br />Budget for this task is estimated at $21,863 as provided in Exhibit B — Compensation per Hourly <br />Rate to a Maximum Amount <br />Task 4 — Hewitt Ave Br. Security Solutions <br />Upon written direction from the City's Project Manager, TRANTECH shall provide engineering <br />design services for City -desired revisions to the Hewitt Ave Bridge identified by the City. <br />Budget <br />Budget for this task is estimated at $25,000 as provided in Exhibit B — Compensation per Hourly <br />Rate to a Maximum Amount <br />Task 5 — Epic Site Engineering Assistance <br />TRANTECH shall provide preliminary engineering analysis services for the City's Epic Site <br />Development as needed and identified by the City. <br />Budget <br />Budget for this task is estimated at $15,000 as provided in Exhibit B Compensation per Hourly <br />Rate to a Maximum Amount <br />Task 6 — Miscellaneous Engineering Support <br />TRANTECH shall provide miscellaneous engineering support under the direction of the City's <br />Project Manager. Anticipated work might include tasks associated with bridge maintenance such <br />as emergency repairs and site visits. Other tasks might include inspection, design, economic <br />analysis, studies and reports, general engineering and structural engineering support for City's <br />various transportation infrastructure as needed and identified by the City. <br />Budget <br />Budget for this task is estimated at $55,043 as provided in Exhibit B — Compensation per Hourly <br />Rate to a Maximum Amount <br />The City of Everett Engineering On -call Services Page 4 <br />TRANTECH ENGINEERING <br />