My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8310 RIM DR Geotech Report 2018-01-02 MF Import
>
Address Records
>
RIM DR
>
8310
>
Geotech Report
>
8310 RIM DR Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 2:15:42 PM
Creation date
9/22/2022 7:32:22 AM
Metadata
Fields
Template:
Address Document
Street Name
RIM DR
Street Number
8310
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Gnginecring E�„�uation <br /> 8310 IZim Drivc- Rynn <br /> Novembcr R, 2004 <br /> RMI Pilc No. 21604 <br /> Pagc 7 <br /> compaclion specificalion of strucUiral Iill. Pinal slopes ;hould be planted and covercd �vith strn�v or jute <br /> nettia�. The vegetation should be maintained until it is established. <br /> Structurul Fill <br /> General: All fill placed bcncath huildings, pnvemcnts or othcr settlement-sensitivc fcatures should bc <br /> placed us structur�l fill. Por thc purpose of this report, structural lill is defined as material thnt is placed <br /> in nccordancc with p�cscribed methods and standards, and is monitored by an e�periei�ced gcotechnical <br /> profes�ional or soils technicinn. PieW monitoring procedures would include the performance of a <br /> representatiee nwnber ol' in-pince density tests to document the atlninment of the desimd degrec of <br /> relative compaction. 'I'he areas to receive fill should b�• prepared as oudmed in the Site Preparation and <br /> GraJing sr.bscction of this rcport. <br /> Materials: Imported structuriil fill shuuld consist of a goud qualitq, free-draining eranular soil, frec of <br /> org�nics am' other dcleteriou_= malr.rial. nnd be ��ell graded to ❑ masimum size of i�bout 3 inchcs. <br /> Importe.:, ali-weuthcr fill should mcct thesc requircments, and also should contain no more then nbout � <br /> perccnt tincs(suil passing a U.S. No. 200 Sicve), based on that fraction passing thc U.S. 3/4-inch sievc. <br /> 1'lic on-siti nntivc •:�ils prcdominandy comprisc medium sanJ widi gr�vel and cobbles. It may be <br /> fcasihle to usc thi�, matcrial us structural ti�!, if it is rclativcly free ci organics and can be moisWre- <br /> conditioned to ncnrv�,F,;i;�nnn moisturo contcnt lor compnction. l'he necessary moiswre-conditioning may <br /> �onsist of drying the matcri.d, which ��ould rcquirc .in adequmc arca tu sprcad the mnter�nl out. Drying <br /> Ihe mnlerial maV��ot be possiblc outside of the sununcr season. <br /> �ill 1'lacement �oilnwing suh•;radc preparation, placement of the stnrcturnl fill may procced. All fill <br /> should bc pineed in 6- tc� 8-inch thick wii(orni lifts. and cach IiR should be spread evenly and be <br /> thoroughly cotnpacted prior to placemcnt of subsequent lifis. All stnictural fill underlying building areas <br /> shomd be compnctcd to at Icast 95 perccnt oC its masimum dry density. Macimum dry densit}', in this <br /> repurt, rcfcr, to tliat densiq� �s determincd b�- thc AST�1 D 15?7 compnction test procedurc. The <br /> moisture content of thc soils to bc coiupncted should be within about � n�����,e or on���»���,. so �nne n <br /> rcndily compnctnble condition e�ists. It may be nettssup�to o�•cresc���atc nnd remoae wet soils in cases <br /> where drying to a compnctable conditiun is not fensible. All compa_tion should be accomplished by <br /> .quipment of a h pe and size sufficient to auain the desired degrc�of cc,mpaction. <br /> RMI Associates, Ltd. <br />
The URL can be used to link to this page
Your browser does not support the video tag.