Laserfiche WebLink
Proposed 7-Eleven Properry <br />9.1 Rock- or CDF-Filled Trenches <br />Subsurjace Erploration and <br />Geotechnica! Engineering Repon <br />Foundation support for the proposed 7-Eleven building could be provided by rock-filled or <br />CDF-filled trenches that extend through the fill and topsoil to medium dense to very dense, <br />natural sediments. CDF is a fluid mixture of cement, water, fly ash, and fine aggregate that <br />hardens without settlemcnt several hours after placement. CDF can be re-excavated by hand <br />or hackhoe after it hardens, depending on the specified design mir. In exploration pits EP-1 <br />�nd EF-2, the depth to suitable nan:ral bearing sediment was approximately 4 to 4�h feet deep. <br />ff trenches are used, they should be backfilled ro footing grade with either 2- to 4-inch crushed <br />rock or CDF. Rock-filled trenches should have a minimum width of 4 feet (or as designated <br />by the field er.ginecdengineerir.g geologisq, and CDF-filled trenches should have a minimum <br />width of 3 fer,t and extend at least 1 foot beyond the footing edges. <br />Column footings need to be excavated so the quarry rock extends beyond the edge of the <br />footing a distance equal to approximately half the thickness of thc rock or at least 1 foot <br />outside the edge of the footing if CDF is used. <br />The use of a larger, track-mounted excavator will greatly speed trench excavation over the use <br />of a conventional, rubber-tired backhoe. in order to reduce disturbance of the soils exposed in <br />the trench, it is recommended that the excav�ror bucket be equipped wid� a smooth cutting <br />edge. To determine when suitable bearing has bcen achieved, and to verify proper placement <br />for crushed rock or CDP, the geotechnical engineer or their representative must be present on <br />a full-time basis dur:ng trench excavation and backfill. <br />Rock trenches shoulJ be backfilled with 2- to 4-inch-sized crushed rock. We do not anticipate <br />caving. However, if caving is encountered, it would be appropriate to backfill the trenches as <br />the excavation proceeds to reduce caving. The crushed rock must be tamped into place to <br />achieve a tighdy packed mass; this map be done with either a hoepac compactor or, more <br />rypically, with thc bucket of the trackhoe itself. Staging areas should be maintained so that the <br />rock is not contaminated by mud prior to placement in the trench. <br />CDF-filled trenches should be backfilled using CDF with a minimum compressive strength of <br />300 psi. <br />9.2 Sprcad FootinQ Foundations <br />S;�read footings may be used for building support when placed �ver properly a,�structed <br />'.renches filled with crushed rock or CDi', as described above. Footings placed in this manner <br />must be designed for an allowable bearing pressure of 2,000 pounds per square foot (ps�, <br />,tivrrli l 9, 200; ASSOCIATED E1RTH SGENCES <br />SR/l iyr . I': �MA91.91/ � D�JCP'up� 1-01 - l{:R Page l� <br />�l/ <br />R <br />