Laserfiche WebLink
( <br />Su6surfacr Fxploration nnd <br />Proposed 7-Eleven Properry Geotechnical Engineenng Reporr <br />Evrretr, Washingto�t Praject and Sirt Canditiont <br />I. PROJECT AND SITE CONDITIONS <br />1.0 INTRODUCTION <br />This report prescnts the results of our subsurface exploration and geotechnical eng:neering <br />study for the proposed commercial development located at the northeast corner of the <br />intersection of 112"' Street SE and 7'" Avenue SE in Everett, Washington. The project location <br />is shown on the Vicinity Map, Figure 1. The proposed building locations and ap�roximate <br />locations of the explorations accomplished for this study are presented on the Site and <br />Exploration Plan, Figure 2. In the event that any changes in the nature or design of the <br />proposed project are planned, the condusions and recommendations contained in this report <br />should be reviewed and modified, or verified, as nccessary. <br />(.1 Purpose and Scopc <br />The purpose of this study was to provide subsurface data to be utilized in the design and <br />development of the project. Our study included reviewing available geologic lirerature, <br />excavating exploration pits, performing a visual reconnaissance of the site, and performing <br />geotechnical studies to assess the type, thickness, distribution, and physical properties of the <br />subsurface sediments and shallow ground warer conditions. Geotechnical engineering studies <br />were also conducted to determine the types of suitable foundation, foundation soil bearing <br />pressures and pile/picr capacities, anticipatcd foundation setdement, floor support <br />recommendations, and drainage and erosion control considerations. This report summarizes <br />our current fieldwork and offers development recommendations based on our present <br />understanding of the project. <br />1.2 Authorization <br />Verb�l authorization ro proceed with this smdy was gr.,nted by Mr. Ed O' Sullivan of PaciGc <br />Centers, LLC in 7anuary 2001. Our study �vas accumplished in general accordance with our <br />verbal comnwnications witli Mr. U' Sullivan and has been prepared for the exclusive use of <br />Pacific Centers, LLC and tfieir agents, for specific application to this project. Within the <br />limitatinns of scope, schedule, and budget, our services tiave been performed in accordance <br />with generally accepted geotechnical engineering and engineering geology principles and <br />practices in effect in this area at the time our report was prepared. No other warranty, <br />expressed or implied, is made. Our observations, findings, and opinions are a means to <br />idcntit\ anJ re�luce the inherent risks ta the o�+ner. <br />_— _ -- _-- -------- <br />.11anh I9, 'Ik/1 �ISSOCIA7'FDE:IRTNSCpIF.\'CLS <br />SHH ap � 6PMlY±Y�V � U�IPI"�yi� 1-Of - R"A. L"3�,C � ^ <br />/� <br />