My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 73 00 - 2 <br /> Water Filter Plant Emergency Generator Replacement WO# 3587 ' <br /> 4.2 Work Hours: The Contractor shall provide work schedule. <br /> A. Work hours are limited to the following hours: I <br /> 1. 6:00 AM to 6:00 PM on weekdays. <br /> 2. As approved by Owner's Representative on weekends and state recognized <br /> holidays. I <br /> 4.3 Be aware that all construction sites will be monitored and violators are subject to fines. <br /> 4.4 Other hours may be considered on a limited basis without interruption of Owner's normal <br /> operations. All requests for working hours other than those stated above shall be made <br /> exclusively through the Owner's Representative. <br /> PART 5 - OWNER OCCUPATION AND OPERATIONS <br /> 5.1 Owner intends for uninterrupted water filter plant operations to continue during all <br /> construction work. <br /> A. The Contractor shall coordinate with Owner in scheduling construction activities to <br /> minimize conflict with water filter plant operations. <br /> END OF SECTION 00 73 00 , <br /> 1 <br /> I <br /> 00 73 00 - 2 SPECIAL CONDITIONS <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.