My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 11 00 - 1 <br /> Water Filter Plant Emergency Generator Replacement WO# 3587 <br /> SECTION 01 11 00 - SUMMARY OF WORK <br /> 1.1 SCOPE OF WORK <br /> A. The Work specified for this contract consists of removal of two existing generators <br /> and associated appurtenances, partial demolition and reconstruction of buildings <br /> housing the generators, installation of two new generators, a fuel tank, fuel <br /> delivery systems, electrical infrastructure, and generator synching and control <br /> infrastructure, and generator system testing, commissioning, and utility synching <br /> coordination. The generators, fuel tank, and electrical synching and control <br /> equipment will be provided by the City of Everett. The work generally includes, <br /> but shall not be limited to the following: <br /> 1. Supply and install underground feeders and conduits. <br /> 2. Supply and install system control interconnections using existing conduits <br /> and raceways. <br /> 3. Reroute underground cables and conduits to accommodate Location 1 <br /> building expansion. <br /> 4. Location 1 site, utility, building, and fuel system modifications including <br /> abatement of asbestos containing materials. <br /> 5. Location 2 site, utility, building, and fuel system modifications. <br /> 6. Design, supply, and install engine exhaust and muffler support systems. <br /> 7. Design, supply, and install engine exhaust and muffler insulation systems. <br /> 8. Design, supply, and install pin pile generator support system at Location 2. <br /> ' 9. Removal, demolition, and disposal of the existing generators, selected <br /> mechanical equipment, selected electrical equipment, and selected control <br /> equipment at Location 1, Location 2, and Operations Building. <br /> 10. Installation of new generators, selected mechanical equipment, selected <br /> electrical equipment, and selected control equipment at Location 1, <br /> Location 2, and Operations Building. <br /> ' 11. Setup, testing, and commissioning of new emergency generator system. <br /> 12. Repair and restoration of construction site as necessary. <br /> ' 1.2 ,CONTRACTOR S USE OF SITE AND PREMISES <br /> 01 11 00 - 1 SUMMARY OF WORK <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.