Laserfiche WebLink
City of Everett 01 22 13 - 1 <br /> Water Filter Plant Emergency Generator Replacement WO# 3587 <br /> SECTION 01 22 13 — MEASUREMENT AND PAYMENT <br /> 1.1 SUBMITTALS <br /> A. Submittals: <br /> 1. Schedule of Values: Submit on Contractor's standard form. <br /> 2. Schedule of Estimated Progress Payments: <br /> a. Submit with initially acceptable Schedule of Values. <br /> b. Submit adjustments thereto with Application for Payment. <br /> 3. Application for Payment. <br /> 4. Final Application for Payment. <br /> 1.2 SCHEDULE OF VALUES <br /> ' A. At least fifteen (15) days prior to submitting the first Application for Payment, the <br /> Contractor shall submit to the Engineer, for review and approval, a complete <br /> breakdown of component of all lump sum bid items showing the value assigned <br /> to each portion of work. <br /> B. Upon request of the Engineer, provide documentation to support the accuracy of <br /> the Schedule of Values. <br /> C. Lump Sum Work: <br /> 1. Reflect specified allowances and alternates, as applicable. <br /> 2. List bonds and insurance premiums, mobilization, demobilization, <br /> preliminary and detailed progress schedule preparation, equipment testing, <br /> facility startup, and contract closeout separately. <br /> a. Include item(s) for monthly progress schedule update. <br /> 3. Schedule of Values shall, once approved by Engineer, be used as the basis <br /> for reviewing and determining each monthly progress payment and as such <br /> shall be subject to periodic review by the Engineer to assure that the <br /> Schedule of Values reasonably represents, in the opinion of the Engineer, <br /> the actual value of the individual items of work performed. <br /> D. An unbalanced or front-end loaded schedule will not be acceptable. <br /> E. Summation of the complete Schedule of Values representing all Work shall equal <br /> the Contract Price. <br /> ' F. Submit Schedule of Values in a spreadsheet format compatible with latest version <br /> of MS Excel. <br /> 1.3 SCHEDULE OF ESTIMATED PROGRESS PAYMENTS <br /> 01 22 13 - 1 MEASUREMENT AND PAYMENT <br />