My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 22 13 - 1 <br /> Water Filter Plant Emergency Generator Replacement WO# 3587 <br /> SECTION 01 22 13 — MEASUREMENT AND PAYMENT <br /> 1.1 SUBMITTALS <br /> A. Submittals: <br /> 1. Schedule of Values: Submit on Contractor's standard form. <br /> 2. Schedule of Estimated Progress Payments: <br /> a. Submit with initially acceptable Schedule of Values. <br /> b. Submit adjustments thereto with Application for Payment. <br /> 3. Application for Payment. <br /> 4. Final Application for Payment. <br /> 1.2 SCHEDULE OF VALUES <br /> ' A. At least fifteen (15) days prior to submitting the first Application for Payment, the <br /> Contractor shall submit to the Engineer, for review and approval, a complete <br /> breakdown of component of all lump sum bid items showing the value assigned <br /> to each portion of work. <br /> B. Upon request of the Engineer, provide documentation to support the accuracy of <br /> the Schedule of Values. <br /> C. Lump Sum Work: <br /> 1. Reflect specified allowances and alternates, as applicable. <br /> 2. List bonds and insurance premiums, mobilization, demobilization, <br /> preliminary and detailed progress schedule preparation, equipment testing, <br /> facility startup, and contract closeout separately. <br /> a. Include item(s) for monthly progress schedule update. <br /> 3. Schedule of Values shall, once approved by Engineer, be used as the basis <br /> for reviewing and determining each monthly progress payment and as such <br /> shall be subject to periodic review by the Engineer to assure that the <br /> Schedule of Values reasonably represents, in the opinion of the Engineer, <br /> the actual value of the individual items of work performed. <br /> D. An unbalanced or front-end loaded schedule will not be acceptable. <br /> E. Summation of the complete Schedule of Values representing all Work shall equal <br /> the Contract Price. <br /> ' F. Submit Schedule of Values in a spreadsheet format compatible with latest version <br /> of MS Excel. <br /> 1.3 SCHEDULE OF ESTIMATED PROGRESS PAYMENTS <br /> 01 22 13 - 1 MEASUREMENT AND PAYMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.