Laserfiche WebLink
City of Everett 01 22 13 - 2 <br /> Water Filter Plant Emergency Generator Replacement WO# 3587 I <br /> A. Show estimated payment requests throughout Contract Times aggregating <br /> initial Contract Price. I <br /> B. Base estimated progress payments on initially acceptable progress schedule. <br /> Adjust to reflect subsequent adjustments in progress schedule and Contract <br /> Price as reflected by modifications to the Contract Documents. <br /> 1.4 APPLICATION FOR PAYMENT I <br /> A. Transmittal Summary Form: Attach one Summary Form with each detailed <br /> Application for Payment and include Request for Payment of Materials and <br /> Equipment on Hand as applicable. Execute certification by authorized officer of <br /> Contractor. <br /> B. Use detailed Application for Payment Form suitable to the City and Engineer. <br /> C. Include accepted Schedule of Values for each portion of lump sum Work and the I <br /> unit price breakdown for the Work to be paid on a unit priced basis. <br /> D. Include separate line item for each Change Order and Work Change Directive <br /> executed prior to date of submission. Provide further breakdown of such as <br /> requested by the Engineer. <br /> E. Preparation: I <br /> 1. Round values to nearest dollar. <br /> 2. Submit Application for Payment, including a Transmittal Summary Form and <br /> detailed Application for Payment Form(s) for each schedule as applicable, <br /> a listing of materials on hand for each schedule as applicable, and such <br /> supporting data as may be requested by the Engineer. I <br /> F. No applications for payment will be reviewed or approved until all Action & <br /> Informational submittals have been submitted, reviewed by Owner, and <br /> approved. <br /> 1.5 PAYMENT i <br /> A. Payment for all Lump Sum Work shown or specified in Contract Documents is <br /> included in the Contract Price. Payment will be based on a percentage complete I <br /> basis for each line item of the accepted Schedule of Values. <br /> 1.6 NONPAYMENT FOR REJECTED OR UNUSED PRODUCTS <br /> A. Payment will not be made for following: <br /> 1. Loading, hauling, and disposing of rejected material. <br /> 01 22 13 - 2 MEASUREMENT AND PAYMENT <br /> 1 <br />