My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 21 13 - 12 <br /> Water Filter Plant Emergency Generator Replacement WO#3587 1 <br /> Sales Tax <br /> The Washington State Department of Revenue has issued special rules on the State sales <br /> tax. The Contractor should contact the Washington State Department of Revenue for <br /> answers to questions in this area. The City will not adjust its payment if the Contractor bases <br /> a Bid on a misunderstood tax liability. The Contractor shall not include State retail sales taxes <br /> in the unit bid prices. A separate line item for applying State retail sales tax is provided in the <br /> Bid Form. I <br /> Limitations Regarding Contractor's Claim for Damages <br /> Bidders should review the Contract Documents regarding limitations on claims for <br /> damages. <br /> Delays and Interference <br /> Bidders should review the Contract Documents regarding delays and interference. <br /> Business License <br /> A City of Everett business license is required for the Contractor and Subcontractors <br /> performing Work on this Project. <br /> BIDDER'S CHECKLIST <br /> Forms for Submission with the Bid <br /> The Bidder's attention is especially called to the following forms that must be executed in <br /> full as required and submitted with the Bid. <br /> 1. Bid Form: Show the lump sum and unit price items in the spaces provided on the <br /> Bid Form. To be filled in and signed by the Bidder <br /> 2. Subcontractors Form: To be filled in by the Bidder, if required by these Instructions. <br /> 3. Bid Security: This form is to be executed by the Bidder and the surety company <br /> unless Bid is accompanied by a certified or cashier's check, as required by these <br /> instructions. The amount of the bond or cashier's check, which shall be not less <br /> than five percent of the Total Bid Amount, may be shown in dollars or on a <br /> percentage basis. <br /> 4. Disadvantaged/Minority/Women's Business Enterprise Certification: To be filled in <br /> and signed by the Bidder. <br /> 5. Non-Collusion Affidavit: To be signed, notarized and submitted with the Bid. <br /> Failure to complete and fully execute the aforementioned forms and to submit them with <br /> the Bid may result in rejection of Bid. <br /> Forms for Submission after Award of Contract <br /> The following forms are to be executed after the award of Contract: <br /> 1. Contract: This Contract to be executed by the successful Bidder in duplicate within <br /> 14 calendar days after the award date. <br /> 2. Payment and Performance Bonds: These forms are to be executed by the <br /> successful Bidder and his surety company in triplicate. The amount of these bonds <br /> shall be 100 percent of the Total Bid and shall be submitted with the Contract. <br /> 3. Proof of Insurance: Insurance certificates and endorsements shall be obtained <br /> and maintained in force in accordance with SECTION 00 7200, Part 15 "Liability <br /> and Insurance", of the Contract Documents. <br /> I <br /> 00 21 13 - 12 INSTRUCTIONS TO BIDDERS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.