Laserfiche WebLink
I <br /> City of Everett 00 21 13 - 13 <br /> Water Filter Plant Emergency Generator Replacement WO#3587 <br /> ' 4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must <br /> file with each bond a certified and effectively dated copy of their Power of Attorney. <br /> 5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000) and Affidavit <br /> of Wages Paid (F700-007-000) from the Contractor, Subcontractor and agents to <br /> the Subcontractor shall be submitted to the Employment Standards Division, State <br /> Department of Labor and Industries, Olympia, Washington. If the prime contract <br /> is over$1,000,000, then Contractor also needs to submit L&I Form F700-164-000 <br /> (Affidavit of Wages Paid EHB 2805 Addendum). <br /> 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form <br /> WH347): Contractors, Subcontractors, and agents to Subcontractors using Payroll <br /> Form WH347 may use State of Compliance found on the back of the form. <br /> 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH348). Contractors, <br /> Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall <br /> attach the Statement of Compliance Form WH348 to each payroll. <br /> 8. Approval of Subcontractors: Contractors shall request approval of Subcontractors <br /> on a form provided by the City prior to their working on the Site. <br /> 9. Construction Progress Schedule: To be submitted as required by Section 00 7200, <br /> Part 5 "Progress and Completion", of the Contract Documents by the Contractor <br /> within ten calendar days, or such time as determined by the City, after the date of <br /> receipt of Notice to Proceed. <br /> 10. Traffic Control Plan: Standard Traffic Control Plans are included in the City's <br /> Design and Construction Standards. If, and to the extent, such plans are not <br /> sufficient, complete or adequate to support the Bidder's planned means and <br /> methods of performing the Work, the Bidder must develop an adequate, complete <br /> and sufficient traffic control plan at its cost, that shall be submitted for the City's <br /> approval prior to construction. Deviation from the Standard Plans must be <br /> submitted by the Contractor and approved by the City prior to construction. <br /> 11. Disposal Sites: Provide the City with the location of all disposal sites to be used, <br /> and also provide copies of the permits and approvals for such disposal sites. The <br /> Contractor shall provide the City with copies of all permits for disposal and storage <br /> of surplus materials within ten calendar days after award of the Contract. <br /> END OF SECTION 00 21 13 <br /> I <br /> 1 <br /> 1 <br /> I <br /> i <br /> 00 21 13 - 13 INSTRUCTIONS TO BIDDERS <br /> 1 <br />