My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 41 13 - 2 <br /> Water Filter Plant Emergency Generator Replacement WO# 3587 <br /> ITEM ESTIMATED UNIT CONTRACT <br /> NO. DESCRIPTION UNIT QUANTITY PRICE PRICE <br /> Mobilization and <br /> 1. LS 1 N/A $210,000, <br /> Demobilization <br /> Site: Supply and Install <br /> Underground Feeders <br /> and Conduits. Price <br /> shall include, but not be <br /> limited to, field <br /> 2. LS 1 N/A $21S- 000 00 <br /> investigation, trenching, — <br /> backfilling, material <br /> provision and <br /> installation, and <br /> connections. <br /> Site: Supply and Install <br /> System Control <br /> Interconnections Using <br /> Existing Conduits and <br /> Raceways. Price shall <br /> 3. include, but not be LS 1 N/A $2)0, 006 • 60 <br /> limited to, field <br /> investigation, material <br /> provision and <br /> installation, and <br /> connections. <br /> Location 1: Reroute <br /> Underground Cables <br /> and Conduits to <br /> Accommodate Building <br /> Expansion. Unit price • <br /> shall include, but not be <br /> limited to, field <br /> 4. investigation, trenching, LF 100 $ 15 . 00 $ 1, Coo . 00 <br /> backfilling, material <br /> provision and <br /> installation, and <br /> connections. Actual <br /> quantity will be based <br /> on final installed length <br /> of cables and conduits. <br /> 00 41 13 2 BID FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.