My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc. 8/27/2022
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 12:27:25 PM
Creation date
9/30/2022 10:14:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc.
Approval Date
8/27/2022
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$4,874,905.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction, Inc 2/8/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
735
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' City of Everett 00 41 13 3 <br /> Water Filter Plant Emergency Generator Replacement WO#3587 <br /> I <br /> Location 1; Vermiculite <br /> Insulation Removal, <br /> Disposal, and <br /> I Replacement. Unit price <br /> shall include, but not be <br /> limited to, removal, <br /> I disposal, and <br /> 5. replacement of existing CF 320 $ 2.5 . °° $ `t,, boo . oo <br /> vermiculite insulation <br /> and abatement of <br /> I asbestos containing <br /> materials. Actual <br /> I quantity will be based <br /> on final insulation <br /> replacement volume. <br /> I <br /> Location 2: Design, <br /> 6. Supply, and Install Pin LS 1 N/A $�o� ago ao <br /> Pile Generator Support <br /> I <br /> System <br /> Location 1: Design, <br /> I <br /> 7 Supply, and Install Engine Exhaust and LS 1 N/A $55 000 . °O <br /> Muffler Support System <br /> ILocation 2: Design, <br /> 8. Supply, and Install LS 1 N/A $4-}5,000 QD <br /> Engine Exhaust and <br /> IMuffler Support System <br /> Location 1: Design, ^� <br /> I <br /> Supply, and Install <br /> 9. Engine Exhaust and LS 1 N/A $ 2.0, obo . v° <br /> Muffler Insulation <br /> ISystem <br /> Location 2: Design, <br /> Supply, and Install <br /> I 10. Engine Exhaust and LS 1 N/A $ 15i 000 . °° <br /> Muffler Insulation <br /> I System <br /> jy Location 1: Site, Utility, -- <br /> 11. Building, and Fuel LS 1 N/A $T15,0c. u° <br /> ISystem Modifications <br /> I00 41 13 - 3 BID FORM <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.