My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 1 Tastad Construction
>
Contracts
>
Capital Contract
>
Change Order 1 Tastad Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2022 11:31:18 AM
Creation date
9/30/2022 11:31:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tastad Construction
Approval Date
9/1/2022
Council Approval Date
7/20/2020
Department
Parks
Department Project Manager
Brad Chenoweth
Subject / Project Title
Silver LakeTrail Project
Public Works WO Number
PW2022-075
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003458
Total Compensation
$873,705.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Tastad Construction 8/18/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. This Change Order only changes the contract between Contractor and City to <br /> the extent explicitly provided herein. This Change Order does not change <br /> Contract Time or the Contract Sum. <br /> 3. Signature(s) on this Change Order may be by pdf, email, fax or other electronic <br /> means, in which case such signature(s) will have the same effect as an original <br /> ink signature. This Change Order may be signed in counterparts, each of <br /> which shall be deemed an original, and all of which, taken together, shall be <br /> deemed one and the same document. <br /> CITY <br /> r-, <br /> Attest: <br /> Document <br /> Approved as to Form <br /> ! Office of the City Attorney <br /> ayor City C erk (8.22.22) <br /> Date: / ( /'Z Date: g <br /> Recommended By <br /> Construction Project Manager (if Engineering Manager Department Director <br /> Manager (if applicable) (if applicable) <br /> applicable) <br /> BRAD Digitally signed by <br /> BRAD CHENOWETH <br /> CH ENOWETH Date:2022.08.24 <br /> 14:18:52-07'00' <br /> Date: Date: Date: Date: <br /> CONTRACTOR <br /> By . Date: / 2-33 <br /> Officer <br />
The URL can be used to link to this page
Your browser does not support the video tag.