My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Herrera Environmental Consultants Inc. 8/27/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Herrera Environmental Consultants Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2022 11:50:30 AM
Creation date
9/30/2022 11:49:41 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Herrera Environmental Consultants Inc.
Approval Date
8/27/2022
Council Approval Date
8/17/2022
End Date
7/31/2027
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
Landfill Gas Collection- Ops & Mgmt Services
Tracking Number
0003466
Total Compensation
$276,293.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 1.1 - PROJECT MANAGEMENT/CONTRACT <br /> ADMINISTRATION FOR RIVERFRONT <br /> (PROJECT NUMBER 22-07824-000) <br /> Tyson Wright is Herrera's project manager assignment for this project. Eric Evans is Riverfront's <br /> project representative for this project. <br /> Herrera's project manager will be responsible for ongoing administration of the project, <br /> including preparing invoices and progress updates, as well as coordination of work efforts with <br /> Riverfront. Herrera's project manager will have phone and e-mail contact with the Client on an <br /> as-needed basis. <br /> Deliverables <br /> Monthly invoices to Riverfront. <br /> TASK 2.0 - EXISTING PERIMETER AND BOULEVARD <br /> SYSTEMS FOR THE CITY (PROJECT NUMBER <br /> 22-07824-100) <br /> The City has responsibility for O&M of the existing perimeter and Riverfront Boulevard systems. <br /> City personnel will gather data and Herrera will provide data review, and system performance <br /> evaluations for these systems through site visits and data analyzation. Herrera will provide <br /> technical oversight as needed and requested by the City. Site visits will include the review of <br /> control settings, review of operational records, surface air monitoring events and review of the <br /> operational practices. Herrera will also make recommendations of system operations and <br /> maintenance needs and provide support to complete the maintenance as needed. Herrera will <br /> not be providing any maintenance or repair services for the City under this contract. With <br /> respect to maintenance/repairs, Herrera will provide support services as stated in this Scope of <br /> Work as necessary for the City or its contractors to undertake maintenance/repairs. <br /> Herrera may also design modifications to the Landfill Gas System that are needed to ensure <br /> proper operation of the City's system components. Herrera will provide site visits, as requested, <br /> for related system observation, sampling, and monitoring. O&M activities and frequency for the <br /> Existing City systems are detailed in Table 1. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.