My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Military Dept 6/29/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
WA ST Military Dept 6/29/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:19 AM
Creation date
9/30/2022 1:15:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Military Dept
Approval Date
6/29/2022
Council Approval Date
6/22/2022
End Date
4/30/2024
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
Evergreen Pump Station Permanent Generator
Public Works WO Number
D22-024
Tracking Number
0003456
Total Compensation
$946,895.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k. Failure to timely submit complete reports and reimbursement requests as required by this <br /> Agreement(including but not limited to those reports in the Project Development Schedule <br /> Attachment 4)will prohibit the SUBRECIPIENT from being reimbursed until such complete <br /> reports and reimbursement requests are submitted and the DEPARTMENT has had <br /> reasonable time to conduct its review. Final reimbursement requests will not be approved <br /> for payment until the SUBRECIPIENT is current with all reporting requirements contained <br /> in this Agreement. <br /> SUBRECIPIENTs shall only use federal award funds under this Agreement to supplement <br /> existing funds, and will not use them to replace (supplant) non-federal funds that have <br /> been budgeted for the same purpose. <br /> The SUBRECIPIENT may be required to demonstrate and document that the reduction in <br /> non-federal resources occurred for reasons other than the receipt or expected receipt of <br /> federal funds. <br /> 5. REPORTING REQUIREMENTS <br /> In addition to the reports as may be required elsewhere in this Agreement, the SUBRECIPIENT <br /> shall promptly prepare and submit the following reports to the DEPARTMENT's Key Personnel: <br /> a. Quarterly progress reports, no later than the 15'day following the end of the fiscal quarter, <br /> indicating the status of the project, to include a brief narrative on progress during the <br /> quarter. The report shall identify the costs incurred to date, the percentage of work <br /> completed, the anticipated completion date of the project, and whether cost under runs or <br /> over runs are expected. In addition, the SUBRECIPIENT should note any challenges or <br /> issues associated with the project. Failure to submit a complete quarterly report within 15 <br /> days following the end of the quarter will result in suspension of all payments to the <br /> SUBRECIPIENT until a complete quarterly report is received by the DEPARTMENT. <br /> b. A final report when the project is completed, prematurely terminated, or project assistance <br /> is terminated. The report shall include a final accounting of all expenditures and a <br /> description of work accomplished. If the project is not completed, the report shall contain <br /> an estimate of the percentage of completion, and shall indicate the degree of usefulness <br /> of the completed project. The report shall account for all expenditures not previously <br /> reported and shall include a summary for the entire project. <br /> c. The SUBRECIPIENT shall submit a quarterly progress report describing current activities <br /> as outlined in the Timeline. <br /> d. The SUBRECIPIENT shall submit a Final Report with final reimbursement no later than <br /> 45 days after Agreement End Date. <br /> e. The SUBRECIPIENT shall also comply with the Federal Funding Accountability and <br /> Transparency Act (FFATA) and related OMB Guidance consistent with Public Law 109- <br /> 282 as amended by section 6202(a) of Public Law 110-252 (see 31 U.S.C. 6101 note), <br /> and complete and return to the DEPARTMENT the FFATA Form located at <br /> http://mil.wa.qov/emergencv-management-divison/grants/requiredgrantforms; which is <br /> incorporated by reference and made a part of this Agreement. <br /> 6. PROCUREMENT <br /> The SUBRECIPIENT shall comply with all procurement requirements of 2 CFR Part 200.318 <br /> through 200.326 and as specified in the General Terms and Conditions, Attachment 2, A.11. <br /> 7. TIME EXTENSIONS <br /> A time extension request for Agreement completion must be submitted by the SUBRECIPIENT <br /> to the DEPARTMENT no later than 60 days before the end of the Period of Performance. A time <br /> extension request must be in writing and identify the project, the reason the project will not be <br /> completed within the approved Period of Performance, a current status of the completion of the <br /> work, a detailed timeline for completion of the remaining elements, and an anticipated completion <br /> date for the completion of the remaining work. Failure to timely submit a complete time extension <br /> request may result in denial of the time extension and loss of funding for the project. <br /> Mitigation Project Grant Agreement Page 5 of 29 City of Everett, D22-024 Revised <br /> Form 4/17/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.