My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Military Dept 6/29/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
WA ST Military Dept 6/29/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:19 AM
Creation date
9/30/2022 1:15:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Military Dept
Approval Date
6/29/2022
Council Approval Date
6/22/2022
End Date
4/30/2024
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
Evergreen Pump Station Permanent Generator
Public Works WO Number
D22-024
Tracking Number
0003456
Total Compensation
$946,895.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. SUBRECIPIENT MONITORING <br /> a. The DEPARTMENT will monitor the activities of the SUBRECIPIENT from award to <br /> closeout. The goal of the DEPARTMENT'S monitoring activities will be to ensure that <br /> agencies receiving federal pass-through funds are in compliance with this Agreement, <br /> federal and state audit requirements, federal grant guidance, and applicable federal and <br /> state financial regulations, as well as 2 CFR Part 200 Subpart F. <br /> b. To document compliance with 2 CFR Part 200 Subpart F requirements, the <br /> SUBRECIPIENT shall complete and return to the DEPARTMENT 2 CFR Part 200 Subpart <br /> F Audit Certification Form" located at http://mil.wa.gov/emergency-management- <br /> division/grants/requiredqrantforms with the signed Agreement and each fiscal year <br /> thereafter until the Agreement is closed, which is incorporated by reference and made a <br /> part of this Agreement. <br /> c. Monitoring activities may include, but are not limited to: <br /> review of financial and performance reports; <br /> ii. monitoring and documenting the completion of Agreement deliverables; <br /> iii. documentation of phone calls, meetings, e-mails, and correspondence; <br /> iv. review of reimbursement requests and supporting documentation to ensure <br /> allowability and consistency with Agreement work plan, budget, and federal <br /> requirements; <br /> v. observation and documentation of Agreement related activities, such as exercises, <br /> training, funded events, and equipment demonstrations; <br /> vi. on-site visits to review equipment records and inventories, to verify source <br /> documentation for reimbursement requests and performance reports, and to verify <br /> completion of deliverables. <br /> d. The SUBRECIPIENT is required to meet or exceed the monitoring activities, as outlined <br /> above and in 2 CFR Part 200, for any non-federal entity to which the SUBRECIPIENT <br /> makes a subaward as a pass-through entity under this Agreement. <br /> e. Compliance will be monitored throughout the performance period to assess risk. Concerns <br /> will be addressed through a Corrective Action Plan. <br /> 9. CLOSE-OUT <br /> To initiate close-out, the SUBRECIPIENT is required to certify in writing the date completed and <br /> total amount expended on the project on FINAL PROJECT REPORT form to the DEPARTMENT. <br /> After receipt of the FINAL PROJECT REPORT form, the DEPARTMENT will conduct a site <br /> inspection and review supporting documentation for compliance with the requirements of the <br /> Agreement. <br /> Prior to project close-out, the SUBRECIPIENT shall provide the DEPARTMENT with acceptable <br /> documentation supporting compliance with the Agreement. General documentation supporting <br /> compliance with the Agreement typically includes, but is not limited to, the following: <br /> • Photographs of the structures or properties involved in the project prior to project <br /> implementation and after project implementation. <br /> • Digital geospatial coordinates (latitude and longitude) for each structure with an accuracy of <br /> ± 20 meters (64) feet. <br /> • Certificate of occupancy or equivalent documentation from the appropriate regulatory <br /> authority for each structure to certify it is code-compliant. <br /> • Certification that the SUBRECIPIENT has met the environmental and historic preservation <br /> conditions of the grant award as described in this Agreement. <br /> • Copies of all compliance and consultation documentation required by the grant award as <br /> described in the Agreement (e.g., coastal zone management consistency determination from <br /> Department of Ecology). <br /> • Copies of all documentation related to inspection for and removal and disposal of asbestos <br /> and other hazardous materials from each property. <br /> Mitigation Project Grant Agreement Page 6 of 29 City of Everett, D22-024 Revised <br /> Form 4/17/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.