My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 9/29/2022 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2023
>
WA ST Dept of Ecology 9/29/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 11:20:58 AM
Creation date
10/5/2022 11:11:45 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
9/29/2022
Council Approval Date
9/28/2022
End Date
6/30/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington - Broadway Drainage Improvements
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0001878
Total Compensation
$1,317,050.00
Contract Type
Agreement
Contract Subtype
Grant
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT NO. 1 <br />TO AGREEMENT NO. WQC-2019-EverPW-00051 <br />BETWEEN <br />THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY <br />AND <br />City of Everett <br />PURPOSE: To amend the above-referenced agreement (AGREEMENT) between the state of Washington Department of <br />Ecology (ECOLOGY) and City of Everett (RECIPIENT) for the Reduction of CSOs at Two Snohomish River Outfalls <br />(PROJECT). <br /> <br />The RECIPIENT experienced site feasibility setbacks which stopped the original PROJECT from proceeding . The PROJECT <br />was rescoped to a complex design that fits ECOLOGY criteria in the same basin as the original PROJECT . This amendment <br />will extend the AGREEMENT from June 30, 2022 to June 30, 2023 to provide the recipient with additional time to analyze the <br />two proposed alternatives, complete design, and to close out deliverables. This amendment will also modify the PROJECT <br />title, description, scope, and redistribute funds from Tasks 3 and 4 to Task 2, as the RECIPIENT will now prepare only a <br />design for the PROJECT under this AGREEMENT and will no longer complete construction . <br />The budget will be adjusted as follows: <br />Task 2 is increased by $1,359,500.00, from $253,050.00 to $1,612,550.00 (SFAP + SFAP GRI) <br />Task 3 is reduced by $30,000.00, from $30,000.00 to $0.00 <br />Task 4 is reduced by $1,329,500.00, from $1,329,500.00 to $0.00 <br />The expiration date is extended from 6/30/2022 to 6/30/2023. <br />The agreement SOW is modified from Design /Construct to Design Only. <br />IT IS MUTUALLY AGREED that the AGREEMENT is amended as follows: <br />Project Title: <br />Original: Reduction of CSOs at Two Snohomish River Outfalls Amended: Reduction of CSOs at Two Snohomish <br />River Outfalls <br />Expiration Date: <br />Original: 06/30/2022 Amended: 06/30/2023 <br />Project Short Description: <br />Original: <br /> This project will improve water quality in the Snohomish River through design and construction of stormwater best <br />Template Version 10/30/2015 <br />DocuSign Envelope ID: 48DA661C-BF00-44C6-9537-339B3BDF963F
The URL can be used to link to this page
Your browser does not support the video tag.