Laserfiche WebLink
• <br /> Note that the$20,000 quoted for contract value on the permit application should be <br /> revised to$0. The$20,000 original value covers millwork added, which is outside the <br /> scope of this permit. The change of use should require no construction or renovation. It <br /> is our belief that the provision of an accessible drinking fountain be considered as an <br /> incremental upgrade in accessibility. We submit this upgrade for your consideration as a <br /> reasonable accommodation in line with the minimal scope of this project. Providing full <br /> accessibility for the existing restrooms would add tens of thousand of dollars to a zero <br /> dollar change of occupancy project. <br /> Sincerely, <br /> W. Douglas Hofiu , IA, CPHC. <br /> CC: <br /> 2 ! 2 <br />