My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 9/20/2022
>
Contracts
>
6 Years Then Destroy
>
2023
>
Jacobs Engineering Group Inc. 9/20/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 11:43:04 AM
Creation date
10/7/2022 10:05:38 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
9/20/2022
Council Approval Date
9/14/2022
End Date
12/31/2023
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Transportation Engineering Analysis
Tracking Number
0003480
Total Compensation
$346,273.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Jacobs Engineering Group, Inc. 12/14/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1—Number of Study Concepts Developed(assumed for scoping purposes only) <br /> Concept Type Evaluation Process(Task 3) Alternatives Advanced <br /> 1st Level Screening 2nd Level Screening to Design(Task 4) <br /> Corridor Up to 4 Up to 3 1 <br /> Intersection/Spot Locations Up to 12 Up to 8 Up to 5 <br /> Assumptions: <br /> • For the first-level evaluation, concept would be presented as single line sketches on GIS or <br /> equivalent graphics with minimal design/engineering. <br /> • For the second-level evaluation, concepts would only illustrate right-of-way,curb,and <br /> channelization lines on available aerial imagery/basemap. <br /> • Planning level cost estimates would be done using recent industry cost bid items <br /> • Improvements would be contained within the area bound by 1-5 to the east and 41st Street to <br /> the south and Marine View Drive to the north. <br /> Deliverables: <br /> • Draft(up to 1 review) and Final Project Goals Memo <br /> • Draft(up to 2 reviews) and Final Evaluation Process and Results Memo <br /> (Note:this Evaluation Process and Results memo will be a working memo throughout the evaluation <br /> process as it will initially include the evaluation process and criteria definition,then will be updated after <br /> the first level evaluation process to document those decisions and then another update after the second <br /> level evaluation process.) <br /> 4) Conceptual Design and Cost Estimate <br /> Scope: <br /> The Consultant will prepare a Design Standards & Decisions Memorandum documenting design criteria <br /> and decisions. The Consultant will research, develop, and document design criteria for the project. City <br /> standards will be followed where appropriate. <br /> Project design criteria are assumed to include the following elements: <br /> • Roadway <br /> • ADA <br /> • Channelization <br /> The Consultant will review the City of Everett design criteria and develop with the City practical design <br /> principles for the project to minimize impacts while achieving the desired results. The Consultant team <br /> will leverage their experience with WSDOT practical design to inform the design and evaluation and <br /> balancing the needs of the City. The Consultant will develop concept sketches to support the first level <br /> evaluation and single line drawings on aerials to support the second evaluation level (task 3). <br />
The URL can be used to link to this page
Your browser does not support the video tag.