My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 8/27/2022
>
Contracts
>
6 Years Then Destroy
>
2025
>
WA ST Dept of Ecology 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 10:41:32 AM
Creation date
10/7/2022 3:22:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
8/27/2022
Council Approval Date
8/24/2022
End Date
3/31/2025
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
WQC-2022-EverPW-00030 Financial Assistance
Tracking Number
0003492
Total Compensation
$572,000.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Washington State Department of Ecology 12/18/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Grant Agreement (City as Grantee)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:82CF488E-D010-423F-A510-7E548D1F9C38 <br /> DEPARTMENT OF <br /> aim <br /> ECOLOGY <br /> "Wilk State of Washington <br /> Agreement No. WQC-2022-EverPW-00030 <br /> WATER QUALITY COMBINED FINANCIAL ASSISTANCE AGREEMENT <br /> BETWEEN <br /> THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY <br /> AND <br /> CITY OF EVERETT <br /> This is a binding Agreement entered into by and between the state of Washington,Department of Ecology,hereinafter <br /> referred to as"ECOLOGY,"and City of Everett,hereinafter referred to as the"RECIPIENT,"to carry out with the <br /> provided funds activities described herein. <br /> GENERAL INFORMATION <br /> Project Title: Water Quality Retrofit/Improvements;City of <br /> Everett's Programmatic Effort <br /> Total Cost: $572,000.00 <br /> Total Eligible Cost: $572,000.00 <br /> Ecology Share: $429,000.00 <br /> Recipient Share: $143,000.00 <br /> The Effective Date of this Agreement is: 07/01/2021 <br /> The Expiration Date of this Agreement is no later than: 03/31/2025 <br /> Project Type: Stormwater Facility <br /> Project Short Description: <br /> This project will improve water quality in Pigeon Creek, Glenwood Creek,and Edgewater Creek through the retrofit of <br /> two existing detention ponds, installation of two TAPE GULD pretreatment devices,and installation of a bioretention <br /> facility across four sites in the city of Everett.This project will provide treatment for total suspended solids(TSS)oil <br /> (total petroleum hydrocarbons), and floatables from surface water runoff. <br /> Project Long Description: <br /> The RECIPIENT will design and construct stormwater treatment facilities at four separate site locations in the city of <br /> Everett. The four separate site locations are within Port Gardner Bay Watershed. The 2017 City of Everett Surface <br /> Water Comprehensive Plan, identifies Port Gardner Bay watershed as a priority for cleanup and restoration by the <br /> Puget Sound Initiative.These projects are linked to address a combined water quality effort within the watershed and <br /> City.The facilities at each site are described below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.