Laserfiche WebLink
mil <br />SECTION <br />35, <br />- <br />N. <br />W <br />TOWNSHIP <br />��. <br />al <br />4E., <br />a <br />LWAY <br />GREAT NOR'r <br />­T <br />\\ \ MAP OF DARL NGTON <br />\\ GR�DE AREA OVER 40% ! V O L^ 8 I— G . 29 <br />9 <br />i \\ TRACT 999 - <br />\ \ <br />cap <br />APPLICA TION RA TES AND QUA LI TY STANDARDS FOR MULCH ILIA TERIALS <br />MULCH MA TERIALS QUALITY PRODUCTS APPLICA TION RA TES <br />STRAW <br />AIR—DRIED; FREE FROM UNDESIRABLE <br />2"J" THICK; <br />SEED AND COARSE MA TERIAL <br />2—J BALES PER 1000 SF <br />OR 2 — J TONS PER ACRE <br />MOOD FIBER CELLULOSE <br />NO GROWTH INHIBITING FACTORS <br />APPROX. 25---JO LBS <br />PER 1000 SF, OR <br />1000--1.500 LBS PER ACRE <br />COMPOST <br />NO VISIBLE WATER OR DUST DURING <br />2" THICK MIN; (APPROX. 10O <br />HANDLING. MUST BE PURCHASED <br />TONS PER ACRE APPROX. 800 <br />FROM SUPPLIER WITH SOLID WASTE <br />LBS PER YARD) <br />HANDLING PERMIT <br />v\ �s <br />APPLICATION: <br />MULCH MAY BE APPLIED: <br />ON DISTURBED SURFACES THAT WILL REMAIN UNWORKED FOR MORE THAN 7 DAYS <br />\ ` <br />(2 DAYS IN THE WET SEASON). <br />\ v\ <br />r r r n <br />ON DISTURBED AREAS THAT NEED COVER MEASURES FOR LESS THAN 30 DAYS, <br />AS A COVER FOR SEED DURING THE WET SEASON AND DURING THE HOT SUMMER MONTHS, <br />Aln <br />WET SON, ON DISTURBED SLOPES STEEPER THAN 3H:1 V <br />NMOREESEASON, <br />-' <br />_ •. r — �✓ <br />\ — r <br />WITH 10FEET OF VERTICAL RELIEF. <br />r <br />r r <br />r <br />MAIN EN NCE, <br />DE <br />M <br />MULCH MUST BE INSPECTED REGULARLY AND MORE MULCH ADDED AS NEEDED TO <br />\ <br />MAINTAIN THE SUGGESTED APPLICATION RATE. ALL RIPS OR TEARS IN PLASTIC SHEETING <br />\ <br />I SHALL BE REPAIRED. SHEETING SHALL BE CHECKED TO ENSURE IT IS PROPERLY <br />t <br />OVERLAPPED AND WEIGHTED IN PLACE, SHEETING SHALL BE RE —LAPPED AND WEIGHTS <br />' <br />EX. SFft <br />REPLACED AS NEEDED. <br />FF ELE 116.0 <br />V. - <br />MULCH. <br />EX.SFR'._ <br />I <br />i <br />5 247 5116.01 <br />PER CITY OF EVERETT <br />FF EEEV. = <br />STORM WATER MANUAL <br />D,t FX GARAGE <br />T . <br />i <br />LIMITS OF CLEARING <br />MARK W/ORANGE <br />FLAGGING s ) <br />t <br />S Epp' PE <br />f' ii'4; *.. ! 4' STOCKPILE <br />;, 1 �f,1, / SEE MOTE <br />1 <br />EX, DPI TO TOPSOIL <br />E USED AS SEE NOTE <br />�NSTo ENT. 5' BY 20' PUD EASEMENT <br />REC. NO, 91020050502 <br />o�_ EK <br />I INGRESS, EGRESSW ,_. <br />: Y`.. ��NC <br />30 IN t 4; <br />UTILITY F_SM T W ROM! F <br />1 <br />1 \ <br />4NG <br />— <br />f. <br />_. <br />8 P Yc(E,/ E- 8,c, f <br />[� DECORATIVE YARD LIGHT r3'V_' L1. s' M \ 4. < <br />A 0 f r <br />60 <br />iAA <br />�► <br />r• 1_I} <br />NOTES <br />1, THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING <br />TO REMOVE ANY SEDIMENT TRACKED OFF THE SITE. <br />2. THE CONTRACTOR SHALL PERFORM ROUTINE INSPECTION AND <br />MAINTENANCE OF ALL INSTALLED EROSION AND SEDIMENT <br />CONTROL BMPs, ESPECIALLY AFTER STORMS. <br />3. APPROPRIATE MEASURE SHALL BE TAKEN TO STOP <br />SEDIMENTS FROM ENTERING WATERWAYS IF THE PROPOSED <br />BMPs FAIL. <br />4. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED <br />AND/OR UNSTABUIZED FOR NO MORE THAN 2 DAYS FROM <br />OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 <br />DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />EXISTING SOIL & VEGETATION NOTE: <br />THE SOIL ANALYSIS FOR THIS PROJECT <br />FOUND THE EXISTING SOILS TO BE <br />ESPERANCE SANDS. THE SITE IS <br />CONSISTS OF LAWN, LANDSCAPING, AN <br />EXISTING GARAGE, SHED AND <br />CONCRETE DRIVEWAY. <br />TOPSOIL/STOCK PILE NOTE: <br />PILES ARE TO BE COVERED W/ <br />PLASTIC SHEETING WITHIN 24 HOURS <br />PER BMP C123. <br />CONTRACTOR TO INSTALL SILT FENCING <br />WHERE NECESSARY ALONG PERIMETER <br />IF VEGETATIVE BUFFER DOES NOT <br />PROVIDE ADEQUATE PROTECTION. <br />STANDARD TESC NOTES <br />FILTER FABRIC MATERIAL <br />CONTINUOUSIN <br />ATTACHUSE STAPLES OR WIRE <br />RINGS TO <br />FLIER FABRIC MATERIAL <br />2'X2'X 14 GA W W F 10„ <br />12 — 1 112 " WASHED 4' <br />ROCK OR PEA GRAVEL <br />V <br />1p <br />STEEL POSTS AT 0' OC <br />iA110r_ AAC-C l SUPPORT FENCE <br />5ILM FABRICS. <br />ABRIC OR EQUAL <br />NOTES.- <br />t 1. PLACE 1' OF 3/4" - 1 1 /2" WASHED ROCK OR PEA <br />\//� �` .,_ GRAVEL ON BOTH SIDES OF THE FENCE TO CREATE A <br />BEVEL SHAPE, <br />30" <br />12" x B" TRENCH 2. FABRIC SHALL COVER BOTTOM OF 12"X8" TRENCH <br />AND EXTEND BEYOND THE LIMITS OF THE GRAVEL IN <br />ORDER TO MAINTAIN AN EXCESS OVERLAP OF 2" MINIMUM <br />AS SHOWN. <br />3, SPOIL PILES FROM ADJACENT UTILITY CONSTRUCTION <br />SHALL NOT BE PLACED AGAINST SILT FENCE. <br />APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT <br />CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND <br />LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, <br />ETC.). <br />THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, <br />REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF <br />THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND <br />APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. <br />THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY <br />FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION, DURING THE CONSTRUCTION PERIOD, <br />NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED THE <br />FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION <br />OF CONSTRUCTION. <br />THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION <br />WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE <br />THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, <br />ROADWAYS, OR VIOLATE APPLICABLE WATER STANDARDS. <br />THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br />ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC <br />FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO <br />ENSURE THAT SEDIMENT AND SEDIMENT —LADEN WATER DO NOT LEAVE THE SITE. <br />THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/CONTRACTOR <br />AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. <br />THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A <br />MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM <br />EVENT, <br />AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE <br />WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE <br />CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT <br />LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br />STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF <br />CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL <br />MEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN <br />FOR THE DURATION OF THE PROJECT. <br />SILT FENCE <br />PER CITY STD. PLN. 205A <br />NOT TO SCALE <br />PERMANENT COVER BMP (HYDROSEEDING GENERAL <br />NOTES) <br />1. CONSTRUCTION ACCEPTANCE: WILL BE <br />SUBJECT TO A WELL ESTABLISHED GROUND COVER <br />THAT FULFILLS THE REQUIREMENT OF THE <br />APPROVED CONSTRUCTION PLANS. <br />2. ALL DISTURBED AREAS SUCH AS DETENTION <br />FACILITIES, ROADWAY BACK —SLOPES, ETC. SHALL <br />BE SEEDED WITH A PERENNIAL GROUND COVER <br />GRASS TO MINIMIZE EROSION. GRASS SEEDING WILL <br />BE DONE USING AN APPROVED HYDROSEEDER OR <br />AS OTHERWISE APPROVED BY THE CITY OF <br />EVERETT. <br />3. PREPARATION OF SURFACE: ALL AREAS TO BE <br />SEEDED SHALL BE CULTIVATED TO THE <br />SATISFACTION OF THE CITY INSPECTOR. THIS MAY <br />BE ACCOMPLISHED BY DISCING, RAKING, HARROWING <br />OR OTHER ACCEPTABLE MEANS, <br />4. IMMEDIATELY FOLLOWING FINISH GRADING, <br />PERMANENT VEGETATION (CONSISTING OF RAPID, <br />PERSISTENT AND LEGUME) WILL BE APPLIED. <br />(MINIMUM 80# PER ACRE). THIS IS TO INCLUDE THE <br />FOLLOWING: 20% ANNUAL, PERENNIAL OR HYBRID <br />RYE GRASS, 40% CREEPING RED FESCUE, 40% <br />WHITE CLOVER. HYDROSEED REQUIRED. <br />. FERTILIZER: SHALL BE APPLIED AT 400# PER <br />ACRE OF 10-20-20 (10 LB. PER 1,100 SQUARE <br />FEET) OR EQUIVALENT. <br />PERMANENT SEEDING <br />PER CITY OF EVERETT <br />STORM WATER MANUAL <br />2-3.5 BMP E1.35 <br />1 <br />3N <br />LL 48 HOURS <br />,toms` O " $ E r <br />( P <br />