I
<br />SECTION 35, TOWNSHIP 29N, RANGE 4E.
<br />W.Mom
<br />' XI TIN G --
<br />®YSTEM
<br />®p�� Mpg --"
<br />MAP OF DARLINGTON
<br />GR�DE AREA OVER • 07. � V O L 89
<br />P G . 29
<br />TRACT 999
<br />I L
<br />�� ��� --
<br />i
<br />\ \ t 3
<br />21
<br />E , _'. x
<br />,,- �..
<br />i
<br />t � e
<br />rij
<br />� � 1
<br />1 t
<br />_.-
<br />i
<br />f,
<br />�'''
<br />\ 1l
<br />— /
<br />i `•391, / r
<br />PR
<br />OP. YARD
<br />DRAIN (.)
<br />>3 i tt
<br />M
<br />k "-
<br />I� I
<br />130' INGRESS, EGRESS
<br />UTILITY ESM'T
<br />i
<br />i
<br />CONK,
<br />,
<br />F
<br />i
<br />-
<br />........_. ...
<br />..
<br />-DECORATIVE YARD LIGHT
<br />- n t.'
<br />u `
<br />t
<br />ADDITIONAL D/W
<br />(1,010 SF)
<br />0T 3
<br />AREA `A'
<br />2,089 SF
<br />1
<br />5' BY 20' PUD EASEMENT
<br />REC. NO. 91020050502
<br />1 �
<br />r
<br />4. K €
<br />i
<br />C" .
<br />LEGEND
<br />PROPOSED CONCRETE
<br />BASIC IL AMENDMENT NOTES
<br />SOIL_ RETENTION. RETAIN, IN AN UNDISTURBED STATE, THE DUFF LAYER AND NATIVE TOPSOIL TO THE MAXIMUM EXTENT PRACTICABLE. IN
<br />ANY AREAS REQUIRING GRADING REMOVE AND STOCKPILE THE DUFF' LAYER AND TOPSOIL ON SITE IN A DESIGNATED, CONTROLLED AREA,
<br />NOT ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS, TO BE REAPPLIED TO OTHER PORTIONS OF THE SITE WHERE FEASIBLE.
<br />SOIL QUALITY. ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT BEEN COVERED BY IMPERVIOUS SURFACE, INCORPORATED
<br />INTO A DRAINAGE FACILITY OR ENGINEERED AS STRUCTURAL FILL OR SLOPE SHALL, AT PROJECT COMPLETION, DEMONSTRATE THE
<br />FOLLOWING:
<br />1. A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF 10% DRY WEIGHT IN PLANTING BEDS, AND 5% ORGANIC MATTER
<br />CONTENT IN TURF AREAS, AND A PH FROM 6.0 TO 8,0 OR MATCHING THE PH OF THE UNDISTURBED SOIL. THE TOPSOIL LAYER SHALL
<br />HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE ROOTS LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED
<br />TO MEET THE CRITERIA. SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES WITH SOME INCORPORATION
<br />OF THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE,
<br />2. MULCH PLANTING BEDS WITH 2 INCHES OF ORGANIC MATERIAL
<br />3. USE COMPOST AND OTHER MATERIALS THAT MEET THESE ORGANIC CONTENT REQUIREMENTS:
<br />a. THE ORGANIC CONTENT FOR `r'RE— APPROVED" AMENDMENT RATES CAN BE MET ONLY USING COMPOST MEETING THE COMPOST
<br />SPECIFICATION FOR BMP T7.30: BIORETENTION CELLS, SWALES, AND PLANTER BOXES (P.959), WITH THE EXCEPTION THAT THE
<br />COMPOST MAY HAVE UP TO 35% BIOSOLIDS OR MANURE. THE COMPOST MUST ALSO HAVE AN ORGANIC MATTER CONTENT OF 40% TO
<br />65%, AND A CARBON TO NITROGEN RATIO BELOW 25:1. THE CARBON TO NITROGEN RATIO MAY BE AS HIGH AS 35:1 FOR PLANTINGS
<br />COMPOSED ENTIRELY OF PLANTS NATIVE TO THE PUGET SOUND LOWLANDS REGION.
<br />b. CALCULATED AMENDMENT DATES MAY BE MET THROUGH USE OF COMPOSTED MATERIAL MEETING (A.) ABOVE; OR OTHER ORGANIC
<br />MATERIALS AMENDED TO MEET THE CARBON TO NITROGEN RATIO REQUIREMENTS, AND NOT EXCEEDING THE CONTAMINANT LIMITS
<br />IDENTIFIED IN TABLE 220--`B, TESTING PARAMETERS, IN WAC 173-350--220.
<br />THE RESULTING SOIL SHOULD BE CONDUCIVE TO THE TYPE OF VEGETATION TO BE ESTABLISHED.
<br />IMPLEMENTATION OPTIONS: THE SOIL QUALITY DESIGN GUIDELINES LISTED ABOVE CAN BE MET BY USING ONE OF THE METHODS LISTED
<br />BELOW:
<br />1. LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM COMPACTION DURING CONSTRUCTION.
<br />2. AMEND EXISTING SITE TOPSOIL OR SUBSOIL EITHER AT DEFAULT `PRE-- APPROVED" RATES, OR AT CUSTOM CALCULATED RATES BASED
<br />ON TESTS OF THE SOIL AND AMENDMENT.
<br />3. STOCKPILE EXISTING TOPSOIL DURING GRADING, AND REPLACE IT PRIOR TO PLANTING. STOCKPILED TOPSOIL MUST ALSO BE AMENDED
<br />IF NEEDED TO MEET THE ORGANIC MATTER OR DEPTH REQUIREMENTS, EITHER AT A DEFAULT `PRE- APPROVED" RATE OR AT A CUSTOM
<br />CALCULATED RATE.
<br />4. IMPORT TOPSOIL MIX OF SUFFICIENT ORGANIC CONTENT AND DEPTH TO MEET THE REQUIREMENTS,
<br />MORE THAN ONE METHOD MAY BE USED ON DIFFERENT PORTIONS OF THE SAME SITE, SOIL THAT ALREADY MEETS THE DEPTH AND
<br />ORGANIC MATTER QUALITY STANDARDS, AND IS NOT COMPACTED, DOES NOT NEED TO BE AMENDED.
<br />ElAREA A AREA B
<br />STOCKPILE AND UNCOMPACTED, UNGRADED,
<br />AMEND SOIL IF UNDISTURBED
<br />NECESSARY "OPTION 3"
<br />BASIC DRAINAGE DOTES
<br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE UNTIL IT
<br />HAS BEEN INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT,
<br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTION
<br />STANDARDS AND SPECIFICATIONS AND THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD,
<br />BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION).
<br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS
<br />AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION
<br />OF LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN, IF CONFLICTS WITH
<br />EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBLIC
<br />WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER
<br />PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT.
<br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT—OF—WAY OR IN EASEMENTS MUST BE STAKED BY
<br />SURVEY FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION.
<br />5, ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO
<br />STREAM, LAKE, RIVER, PUGET SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE
<br />PROJECT.
<br />CALL 48 HOURS
<br />BEFORE YOU DIG
<br />Y
<br />ow
<br />U)
<br />e
<br />z
<br />b
<br />xi _
<br />Jkr:-.
<br />,Y
<br />"
<br />a.
<br />=O
<br />{a;*4
<br />fl �,aai
<br />x r;)
<br />e
<br />,,,.; �.
<br /><
<br />q
<br />0
<br />
|