Laserfiche WebLink
I <br />SECTION 35, TOWNSHIP 29N, RANGE 4E. <br />W.Mom <br />' XI TIN G -- <br />®YSTEM <br />®p�� Mpg --" <br />MAP OF DARLINGTON <br />GR�DE AREA OVER • 07. � V O L 89 <br />P G . 29 <br />TRACT 999 <br />I L <br />�� ��� -- <br />i <br />\ \ t 3 <br />21 <br />E , _'. x <br />,,- �.. <br />i <br />t � e <br />rij <br />� � 1 <br />1 t <br />_.- <br />i <br />f, <br />�''' <br />\ 1l <br />— / <br />i `•391, / r <br />PR <br />OP. YARD <br />DRAIN (.) <br />>3 i tt <br />M <br />k "- <br />I� I <br />130' INGRESS, EGRESS <br />UTILITY ESM'T <br />i <br />i <br />CONK, <br />, <br />F <br />i <br />- <br />........_. ... <br />.. <br />-DECORATIVE YARD LIGHT <br />- n t.' <br />u ` <br />t <br />ADDITIONAL D/W <br />(1,010 SF) <br />0T 3 <br />AREA `A' <br />2,089 SF <br />1 <br />5' BY 20' PUD EASEMENT <br />REC. NO. 91020050502 <br />1 � <br />r <br />4. K € <br />i <br />C" . <br />LEGEND <br />PROPOSED CONCRETE <br />BASIC IL AMENDMENT NOTES <br />SOIL_ RETENTION. RETAIN, IN AN UNDISTURBED STATE, THE DUFF LAYER AND NATIVE TOPSOIL TO THE MAXIMUM EXTENT PRACTICABLE. IN <br />ANY AREAS REQUIRING GRADING REMOVE AND STOCKPILE THE DUFF' LAYER AND TOPSOIL ON SITE IN A DESIGNATED, CONTROLLED AREA, <br />NOT ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS, TO BE REAPPLIED TO OTHER PORTIONS OF THE SITE WHERE FEASIBLE. <br />SOIL QUALITY. ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT BEEN COVERED BY IMPERVIOUS SURFACE, INCORPORATED <br />INTO A DRAINAGE FACILITY OR ENGINEERED AS STRUCTURAL FILL OR SLOPE SHALL, AT PROJECT COMPLETION, DEMONSTRATE THE <br />FOLLOWING: <br />1. A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF 10% DRY WEIGHT IN PLANTING BEDS, AND 5% ORGANIC MATTER <br />CONTENT IN TURF AREAS, AND A PH FROM 6.0 TO 8,0 OR MATCHING THE PH OF THE UNDISTURBED SOIL. THE TOPSOIL LAYER SHALL <br />HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE ROOTS LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED <br />TO MEET THE CRITERIA. SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES WITH SOME INCORPORATION <br />OF THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE, <br />2. MULCH PLANTING BEDS WITH 2 INCHES OF ORGANIC MATERIAL <br />3. USE COMPOST AND OTHER MATERIALS THAT MEET THESE ORGANIC CONTENT REQUIREMENTS: <br />a. THE ORGANIC CONTENT FOR `r'RE— APPROVED" AMENDMENT RATES CAN BE MET ONLY USING COMPOST MEETING THE COMPOST <br />SPECIFICATION FOR BMP T7.30: BIORETENTION CELLS, SWALES, AND PLANTER BOXES (P.959), WITH THE EXCEPTION THAT THE <br />COMPOST MAY HAVE UP TO 35% BIOSOLIDS OR MANURE. THE COMPOST MUST ALSO HAVE AN ORGANIC MATTER CONTENT OF 40% TO <br />65%, AND A CARBON TO NITROGEN RATIO BELOW 25:1. THE CARBON TO NITROGEN RATIO MAY BE AS HIGH AS 35:1 FOR PLANTINGS <br />COMPOSED ENTIRELY OF PLANTS NATIVE TO THE PUGET SOUND LOWLANDS REGION. <br />b. CALCULATED AMENDMENT DATES MAY BE MET THROUGH USE OF COMPOSTED MATERIAL MEETING (A.) ABOVE; OR OTHER ORGANIC <br />MATERIALS AMENDED TO MEET THE CARBON TO NITROGEN RATIO REQUIREMENTS, AND NOT EXCEEDING THE CONTAMINANT LIMITS <br />IDENTIFIED IN TABLE 220--`B, TESTING PARAMETERS, IN WAC 173-350--220. <br />THE RESULTING SOIL SHOULD BE CONDUCIVE TO THE TYPE OF VEGETATION TO BE ESTABLISHED. <br />IMPLEMENTATION OPTIONS: THE SOIL QUALITY DESIGN GUIDELINES LISTED ABOVE CAN BE MET BY USING ONE OF THE METHODS LISTED <br />BELOW: <br />1. LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM COMPACTION DURING CONSTRUCTION. <br />2. AMEND EXISTING SITE TOPSOIL OR SUBSOIL EITHER AT DEFAULT `PRE-- APPROVED" RATES, OR AT CUSTOM CALCULATED RATES BASED <br />ON TESTS OF THE SOIL AND AMENDMENT. <br />3. STOCKPILE EXISTING TOPSOIL DURING GRADING, AND REPLACE IT PRIOR TO PLANTING. STOCKPILED TOPSOIL MUST ALSO BE AMENDED <br />IF NEEDED TO MEET THE ORGANIC MATTER OR DEPTH REQUIREMENTS, EITHER AT A DEFAULT `PRE- APPROVED" RATE OR AT A CUSTOM <br />CALCULATED RATE. <br />4. IMPORT TOPSOIL MIX OF SUFFICIENT ORGANIC CONTENT AND DEPTH TO MEET THE REQUIREMENTS, <br />MORE THAN ONE METHOD MAY BE USED ON DIFFERENT PORTIONS OF THE SAME SITE, SOIL THAT ALREADY MEETS THE DEPTH AND <br />ORGANIC MATTER QUALITY STANDARDS, AND IS NOT COMPACTED, DOES NOT NEED TO BE AMENDED. <br />ElAREA A AREA B <br />STOCKPILE AND UNCOMPACTED, UNGRADED, <br />AMEND SOIL IF UNDISTURBED <br />NECESSARY "OPTION 3" <br />BASIC DRAINAGE DOTES <br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE UNTIL IT <br />HAS BEEN INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT, <br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTION <br />STANDARDS AND SPECIFICATIONS AND THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, <br />BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION). <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS <br />AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION <br />OF LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN, IF CONFLICTS WITH <br />EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBLIC <br />WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER <br />PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. <br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT—OF—WAY OR IN EASEMENTS MUST BE STAKED BY <br />SURVEY FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. <br />5, ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO <br />STREAM, LAKE, RIVER, PUGET SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE <br />PROJECT. <br />CALL 48 HOURS <br />BEFORE YOU DIG <br />Y <br />ow <br />U) <br />e <br />z <br />b <br />xi _ <br />Jkr:-. <br />,Y <br />" <br />a. <br />=O <br />{a;*4 <br />fl �,aai <br />x r;) <br />e <br />,,,.; �. <br />< <br />q <br />0 <br />