Laserfiche WebLink
SFR <br />SECTION, ��TOWNS�HIP 28N,, RANGE 5E. W.M. <br />j CCIVIL ENGINEER SITE ®F <br />1 <br />\ OMEGA ENGINEERING, INC. <br />JOSEPH SMEBY, PE SITE ADDRESS: 6402 HIGHLAND DR SE. EVERETT, WA 98203 <br />f f <br />2 707 WETMORE AVE, PARCEL NUMBER. 00531 700500300 <br />00531700500102 EVERETT, WA 9 201 ZONING: R--2 <br />s' 4.25.387.3 20 <br />F.425.259.19 8 OWNER /A-PPLICANT <br />IGO€� IRIINA EORIC�L <br />/ 32 HIGHLAND DR <br />REEVE LAND SURVEYING UNIT B <br />4-"0 16 TH ST SW <br />' 7 EVERETT, WA 98203 <br />r / ` LYNNWOOD, WA 98087 <br />/ r / 20.49.079 <br />w� <br />EX. GARAGE! \; � COV'D PATIO 3 <br />11�8 / fDRAWING INDEX <br />1) COVER, PRELIM SITE LAYOUT & SWPPP <br />v <br />o� BSBL 2) TARGETED STORMWATER SITE PLAN <br />00531700500200 <br />f" f& SOIL MANAGEMENT PLAN <br />DETAILS <br />#- W q ` h / - E 20 BSBL - f `� - <br />00531700500301 G f ;LEGALDESRIP <br />TI <br />ON <br />NORTH BEVERLY PARK DIV 2 BLK 005 D--00 'N 65FT OF E 120FT OF LOT 3 <br />EX. SFR <br />ESQ SELY 1 C3FT TO CITY OF EV PER 'AID REC IN VOL 1330 P 18. AUD FILE <br />(TBR) <br />\ „ � NO 78062002.86 — AKA LOT 1 & PTN LOT 2 CITY OF EV SP REC <br />AFN 78062 031 <br />®V'Cs b /4 .' s <br />00531700201 B00 <br />?ROP. SFR �i : <br />� " _ � . ram` "'�`h � f� V <br />(2,169 SF) \ <br />10' <br />` \ 5' BSBL <br />a <br />f PLOP. CONCR TE Y ✓ <br />f <br />D/rpp� >Q <br />Ul <br />~ LIMITS OF CLEARING <br />.._.. 00531700201700 MARK W/ ®RANGE FLAGGING <br />CIO � 5 �t � (6,049 SF) (BMP C103) FLAGGING --., <br />IN <br />EX. GARAGE. <br />Y jf (TBR)= 710' <br />,I 0053.1700500400�, <br />f � \ <br />` 00531700500301 <br />j EX. SFR <br />p, -- \ \ (TBR) <br />0 20 40 l <br />HORIZONTAL SCALE <br />EROSION• I T TI T T <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL TOPSOIL/STOCK PILE NOTE: <br />OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, PILES ARE TO BE COVERED / PLASTIC <br />CHANNELS, RETENTION FACILITIES, UTILITIES); SHEETING WITHIN 24 HOURS IN <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND ACCORDANCE WITH BMP C123. <br />UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL <br />ALL CONSTRUCTION IS COMPLETED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. CONTRACTOR TO INSTALL SILT FENCING <br />3. THE BOUNDARIES OF THE CLEARING. LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE WHERE NECESSARY ALONG PERIMETER IF <br />FIELD PRIOR . TO CONSTRUCTION. DURING: THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE VEGETATIVE. BUFFER DOES NOT PROVIDE <br />FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE ADEQUATE PROTECTION IN ACCORDANCE <br />APPLICANT/CONTRACTOR FOR THE DURATION OF `CONSTRUCTION. WITH BMP C102. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED 1N CONJUNCTION WITH ALL CLEARING <br />AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT <br />LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER EXISTING SOIL & VEGETATION NOTE: <br />QUALITY STANDARDS.THE SOIL ANALYSIS FOR THIS <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE PROJECT FOUND THE EXISTING <br />CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED SOILS TO BE SANDY LOAM. THE <br />FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT —LADEN WATER DO SITE IN THE AREA OF DISTURBANCE <br />NOT LEAVE THE SITE, CURRENTLY CONSISTS OF AN <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE APPLICANT/CONTRACTOR EXISTING GARAGE, DRIVEWAY, <br />TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. WALKWAY, SFR, AND LAWN, <br />7, THE ESC FACILITIES ON INACTIVE SiTES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A <br />MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. L <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A UTILITIES NOTE: <br />TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE' LINES SHALL BE CLEANED PRIOR TO CONTRACTOR TO LOCATE AND TIE <br />INTO EXISTING UTILITIES ON SITE. <br />PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM <br />SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT. THE BEGINNING OF CONSTRUCTION AND <br />MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE <br />THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT <br />TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES <br />IF THE PROPOSED BMPS FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN <br />2 DAYS FROM OCTOBER `I THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH <br />SEPTEMBER 30, <br />TOTAL AREA m 0. 14 A <br />1 APf=RVI0 11q ARFA StJMMARY TABLE <br />80 <br />GRAQN�G—�NTITIE� <br />CUT -- 130 C.Y." <br />FILL = 130 C.Y. <br />GRADING QUANTITIES ESTIMATED BASED <br />ON CURRENT SITE INFORMATION & <br />ASSUMED EXCAVATIONS NECESSARY FOR <br />PROPOSED IMPROVEMENTS. <br />Ty o a <br />LEGEND <br />m <br />AVG ELEV.= 1,719' / 4 = 429.76` <br />MAX. BLDO HT.= 42 .75' + 24.0' = 463.75' <br />SITE <br />710- —� y" <br />SCALE." 1" = 2,000' <br />1 � „ <br />00531700500200 <br />-� EX. D/W TOj <br />1 BE USED AS / <br />3 CON,ST. ENT. / <br />BMP C105) r <br />/Arf <br />00531700201 B00 <br />STOCKPILE <br />I\SEE NOTE <br />TCP50IL-,� <br />SEE NOTE <br />' . INSTALL SILT <br />;mo t /, rh t FENCE <br />'\ <br />' s <br />191->07 <br />yN4' <br />00531700201700 <br />.� kP ..q� /.DRAIN INLET ~ <br />PROTECTION <br />I / (BMP C220) <br />j` /f <br />swppp <br />I <br />a� <br />I <br />04 <br />WW <br />04 <br />W <br />. <br />WLu <br />LL <br />00 <br />I <br />I� <br />PROJ. NO. DSN. BY: <br />20-0724 A L <br />DATE: <br />� <br />s <br />10/22/20 <br />s�� 8tl�@ <br />� Call <br />Ail two <br />days before <br />ILA �6®�Y <br />business <br />you dig, <br />SCALE: <br />I" ® i <br />DRAWING NO, <br />OF <br />