Laserfiche WebLink
KIEDRICH, SFR­­ <br />HIP 28N, RANGE 5E,, W.M.. <br />SECTION 6. TOWNS <br />BASIC SOIL AMENDMENT NOTES <br />3' SOIL RETENTION. RETAIN, IN AN UNDISTURBED STATE, THE DUFF LAYER AND NATIVE TOPSOIL TO THE MAXIMUM EXTENT PRACTICABLE. IN <br />\_ td ANY AREAS REQUIRING GRADING REMOVE AND STOCKPILE THE DUFF LAYER AND TOPSOIL. ON SITE IN A DESIGNATED, CONTROLLED AREA, <br /><} AREA 'A' NOT ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS, TO BE REAPPLIED TO OTHER PORTIONS OF THE SITE WHERE FEASIBLE.. <br />(3,263 SF) s <br />COV D PATIO <br />�, SOIL QUALITY. ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT BEEN COVERED BY IMPERVIOUS SURFACE, INCORPORATED <br />0° �� ! INTO A DRAINAGE FACILITY OR ENGINEERED AS STRUCTURAL FILL OR SLOPE SMALL, AT PROJECT COMPLETION, DEMONSTRATE THE <br />FOLLOWING: <br />! 1. A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF 10% DRY WEIGHT IN PLANTING BEGS, AND 5% ORGANIC MATTER <br />CONTENT IN TURF AREAS, AND A PH FROM 6.0 TO 8.0 OR MATCHING THE PH OF THE UNDISTURBED SOIL. THE TOPSOIL LAYER SHALL <br />' f f HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE ROOTS LINT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED <br />_ TO MEET THE CRITERIA. SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES WITH SOME INCORPORATION <br />TRANSITION ZONE `' OF THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE. <br />- A (SEE DETAIL) j 2. MULCH PLANTING BEDS WITH 2 INCHES OF ORGANIC MATERIAL <br />s / 3. USE COMPOST AND OTHER MATERIALS THAT MEET THESE ORGANIC CONTENT REQUIREMENTS: <br />THE ORGANIC CONTENT FOR 'PRE —APPROVED" AMENDMENT RATES CAN BE MET ONLY USING COMPOST MEETING THE COMPOST <br />\ E F\'PW A- / SPECIFICATION FOR BMP T7.30 BIORETENTIQN CELLS, ,SWALES, AND PLANTER BOXES (P.95 ), WITH THE EXCEPTION THAT THE <br />ARR� y ,,, * ;' COMPOST MAY HAVE UP TO 35 BIOSOLIDS OR MANURE. THE COMPOST MUST ALSO HAVE AN ORGANIC MATTER CONTENT Or 40% TO <br />~TYP� A� 1`f'e C®V'D' <br />( 1, PATIO ,'' 65%, AND A CARBON TO NITROGEN RATIO BELOW 25:1. THE CARBON TO NITROGEN RATIO MAY BE AS NIGH AS 35:1 FOR PLANTINGS <br />T_OP; SFR '- .`. _' COMPOSED ENTIRELY OF PLAITS NATIVE TO TI IE PUGET SOUND LOWLANDS REGION. <br />\ (z, SF) b. CALCULATED AMENDMENT BATES MAY BE MET THROUGH USE OF COMPOSTED MATERIAL MEETING (A.) ABOVE; OR OTHER ORGANIC <br />91 <br />MATERIALS AMENDED TO MEET THE CARBON TO NITROGEN RATIO REQUIREMENTS, AND NOT EXCEEDING THE CONTAMINANT LIMITS <br />710 a <br />IDENTIFIED IN TABLE 220--B, TESTING PARAMETERS, IN WAC 173-350-220. <br />THE RESULTING SOIL SHOULD BE CONDUCIVE TO THE TYPE OF VEGETATION TO BE ESTABLISHED. <br />FcTAT�D STuuT IMPLEMENTATION OPTIONS: THE SOIL DUALITY DESIGN GUIDELINES LISTED ABOVE CAN BE MET BY USING ONE OF THE METHODS LISTED <br />CONNEG=N (SEE GE IL) � � <br />AT OP. �DNCRETE !`' �� BELOW: <br />D/W <br />(�a SF) p� J; 1. LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM COMPACTION DURING CONSTRUCTION. <br />(Typ j f` 3 w. \ 2. AMEND EXISTING SITE TOPSOIL OR SUBSOIL EITHER AT DEFAULT `PRE-APPROVED"RATES, OR AT CUSTOM CALCULATED RATES BASED <br />\. , r w t \r _ ON TESTS OF THE SOIL AND AMENDMENT. <br />> j _.;: l 3. STOCKPILE EXISTING TOPSOIL DURING GRADING, AND REPLACE IT PRIOR TO PLANTING. STOCKPILED TOPSOIL MUST ALSO BE AMENDED <br />w `,DEV• FLOW -,THE C MATTER OR DEPTH REQUIREMENTS, EITHER AT A DEFAULT `PRE-�- APPROVED" RATE OR AT A CUSTOM <br />IF NEEDED TO MEET ORGAN! <br />u ARROWS e 1 f CALCULATED RATE. <br />M 4. IMPORT TOPSOIL MIX OF SUFFICIENT ORGANIC CONTENT AND DEPTH ' TO MEET THE REQUIREMENTS. <br />r .S� � <br />,w? , MORE THAN ONE ME THOD MAY BE USED ON DIFFERENT PORTIONS OF THE SAME SITE, SOIL THAT ALREADY MEETS THE DEPTH AND <br />ORGANIC MATTER QUALITY STANDARDS, AND IS NOT COMPACTED, DOES NOT NEED TO BE AMENDED. <br />F7A <br />t, AREA A AREA 8 <br />AMENDISOIL ND UNDOMPRBEDDp UNGRADED, <br />ISTU <br />NECESSARY "OPTION 3" <br />BASIC <br />0 20 40 <br />I. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE UNTIL IT <br />HORIZONTAL SALT HAS BEEN INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT. <br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTION <br />STANDARDS AND SPECIFICATIONS AND THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, <br />BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION). <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS <br />AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION <br />OF LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH <br />EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBLIC <br />WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER <br />PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. <br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT--OF—WAY OR IN EASEMENTS MUST BE STAKED BY <br />SURVEY FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. <br />5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE' DRAINS TO <br />STREAM, LADE, RIVER, PUET SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE <br />PROJECT. <br />®5 <br />e <br />A. <br />�e <br />I� <br />0 <br />Tj <br />co <br />p <br />