My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 9/6/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 9/6/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 12:38:03 PM
Creation date
10/13/2022 11:45:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
9/6/2022
Council Approval Date
8/31/2022
End Date
12/31/2025
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Structural On-Call Support
Tracking Number
0003494
Total Compensation
$190,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
David Evans Associates 5/28/2025 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC/ David Evans and Associates 4/22/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vehicles (EV)per FHWA Memorandum dated November 3, 2016. TranTech will provide the <br /> actual single unit rating for the SU4—SU7 vehicles regardless of whether the Notional Rating <br /> (screening)Load (NRL) check is greater than 1.0. <br /> The Load Rating Reports will consist of: <br /> • A Bridge Rating Summary Sheet reflecting the lowest rating factor,including <br /> superstructure components. The summary sheet shall be stamped and signed by a <br /> professional engineer licensed in the State of Washington. <br /> • A brief report of any potential anomalies in the ratings and an explanation of the cause of <br /> any rating factor less than 1.0,including site specific proposed load posting that will <br /> cause the least disruption to City of Lake Stevens residents and the traveling public. <br /> • A hard copy of computer output files used for rating, and any other calculations or special <br /> analysis required. <br /> • A complete set of plans for the bridge if they exist. <br /> • A CD which contains the final versions of all input and output files, and other <br /> calculations created in performing the load rating. <br /> • All reports shall be bound in Accopress-type binders. <br /> A paper copy of generated reports will be prepared and submitted to the City for inclusion in the <br /> Official Bridge File. <br /> Quality Assurance Program is an integral part of our work plan. It includes the following: <br /> • Competent and experienced personnel will perform all calculations. <br /> • The load rating will be thoroughly reviewed and checked by experienced personnel prior <br /> to submittal. <br /> • Any rating factor less than 1.0 will receive additional scrutiny to ensure load restrictions <br /> are avoided if possible. <br /> As mentioned above, should load posting become necessary,TranTech will work with the City to <br /> determine the best valid posting solution to cause the least impact to the traveling public. <br /> Deliverables <br /> • Schedule of due dates for each report to be provided within 10-days of executed contract. <br /> • Signed hard copies of all load rating reports for each bridge will be submitted to the City <br /> for inclusion in the individual bridge files. The electronic bridge record in the <br /> The City of Everett Engineering On-call Services Page 2 <br /> TRANTECH ENGINEERING <br />
The URL can be used to link to this page
Your browser does not support the video tag.