My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 9/6/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 9/6/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 12:38:03 PM
Creation date
10/13/2022 11:45:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
9/6/2022
Council Approval Date
8/31/2022
End Date
12/31/2025
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Structural On-Call Support
Tracking Number
0003494
Total Compensation
$190,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
David Evans Associates 5/28/2025 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC/ David Evans and Associates 4/22/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Bridge Inventory will also be updated with the new load rating <br /> information. <br /> Assumptions <br /> • TranTech will work from the as-built plans and the inventory inspection report to <br /> provide the most accurate condition for the load rating calculations. Field visits will be <br /> performed with the approval of the City if questions cannot be resolved through <br /> consultation with City Bridge Inspectors or other City personnel. <br /> • Existing load rating analysis will be reviewed and utilized to the fullest extent possible. <br /> • Some existing load rating analysis may be of little or no use for the update process <br /> requiring a complete re-rating. <br /> • It is assumed that no substructure load rating will be performed. Should it be determined <br /> that this additional evaluation is necessary due to deterioration of the substructure <br /> elements,the City will be contacted for approve of the additional work. <br /> Budget <br /> Budget for this task is estimated at$68,094 and is provided in Exhibit B—Compensation per <br /> Hourly Rate to a Maximum Amount <br /> Task 2—Scour Evaluations <br /> TRANTECH shall provide scour evaluations per WSDOT Bridge Scour Evaluation Form for <br /> uploading into WSDOT Bridge Works for up to 5 City Bridges. <br /> Assumptions <br /> The activities in this task is limited to structures that their scour stability can be determined via <br /> the WSDOT Bridge Scour Evaluation Form. <br /> Buul;et <br /> Budget for this task is estimated at$5,000 as provided in Exhibit B—Compensation per Hourly <br /> Rate to a Maximum Amount <br /> • <br /> The City of Everett Engineering On-call Services Page 3 <br /> TRANTECH ENGINEERING <br />
The URL can be used to link to this page
Your browser does not support the video tag.