Laserfiche WebLink
Washington State Bridge Inventory will also be updated with the new load rating <br /> information. <br /> Assumptions <br /> • TranTech will work from the as-built plans and the inventory inspection report to <br /> provide the most accurate condition for the load rating calculations. Field visits will be <br /> performed with the approval of the City if questions cannot be resolved through <br /> consultation with City Bridge Inspectors or other City personnel. <br /> • Existing load rating analysis will be reviewed and utilized to the fullest extent possible. <br /> • Some existing load rating analysis may be of little or no use for the update process <br /> requiring a complete re-rating. <br /> • It is assumed that no substructure load rating will be performed. Should it be determined <br /> that this additional evaluation is necessary due to deterioration of the substructure <br /> elements,the City will be contacted for approve of the additional work. <br /> Budget <br /> Budget for this task is estimated at$68,094 and is provided in Exhibit B—Compensation per <br /> Hourly Rate to a Maximum Amount <br /> Task 2—Scour Evaluations <br /> TRANTECH shall provide scour evaluations per WSDOT Bridge Scour Evaluation Form for <br /> uploading into WSDOT Bridge Works for up to 5 City Bridges. <br /> Assumptions <br /> The activities in this task is limited to structures that their scour stability can be determined via <br /> the WSDOT Bridge Scour Evaluation Form. <br /> Buul;et <br /> Budget for this task is estimated at$5,000 as provided in Exhibit B—Compensation per Hourly <br /> Rate to a Maximum Amount <br /> • <br /> The City of Everett Engineering On-call Services Page 3 <br /> TRANTECH ENGINEERING <br />