Laserfiche WebLink
Task 3—Grand Ave Ped Bridge Inspection <br /> This task is performed by TranTech's Subconsultant,Fickett Structural Solutions (Fickett). Their <br /> scope of work entails inventory inspection and uploading inspection results within the WSDOT <br /> Bridge Works software as provided in Exhibit A. <br /> Budget <br /> Budget for this task is estimated at$21,863 as provided in Exhibit B—Compensation per Hourly <br /> Rate to a Maximum Amount <br /> Task 4—Hewitt Ave Br. Security Solutions <br /> Upon written direction from the City's Project Manager, TRANTECH shall provide engineering <br /> design services for City-desired revisions to the Hewitt Ave Bridge identified by the City. <br /> Budget <br /> Budget for this task is estimated at$25,000 as provided in Exhibit B—Compensation per Hourly <br /> Rate to a Maximum Amount <br /> Task 5—Epic Site Engineering Assistance <br /> TRANTECH shall provide preliminary engineering analysis services for the City's Epic Site <br /> Development as needed and identified by the City. <br /> Budget <br /> Budget for this task is estimated at$15,000 as provided in Exhibit B—Compensation per Hourly <br /> Rate to a Maximum Amount <br /> Task 6—Miscellaneous Engineering Support <br /> TRANTECH shall provide miscellaneous engineering support under the direction of the City's <br /> Project Manager. Anticipated work might include tasks associated with bridge maintenance such <br /> as emergency repairs and site visits. Other tasks might include inspection, design,economic <br /> analysis, studies and reports, general engineering and structural engineering support for City's <br /> various transportation infrastructure as needed and identified by the City. <br /> Budget <br /> Budget for this task is estimated at$55,043 as provided in Exhibit B—Compensation per Hourly <br /> Rate to a Maximum Amount <br /> The City of Everett Engineering On-call Services Page 4 <br /> TRANTECH ENGINEERING <br />