My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc. 10/6/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
HDR Engineering Inc. 10/6/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 10:18:22 AM
Creation date
10/14/2022 10:16:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc.
Approval Date
10/6/2022
Council Approval Date
10/5/2022
End Date
12/31/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Drainage Improvements
Public Works WO Number
UT3792
Tracking Number
0003503
Total Compensation
$1,299,908.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A LL <br /> 11. The budget is based on production of up to twenty-three (23) 30% design sheets: <br /> a. Conveyance overview plan (1 sheet) <br /> b. Preliminary Storm Plan and Profile (up to 17 sheets) <br /> c. Detail drawings including: <br /> i. Concept WSDOT crossing detail (1 sheet) <br /> ii. Concept BNSF crossing detail sheet (1 sheet) <br /> iii. Conveyance pipe connection/disconnection plan detail Sheet (1 sheet) <br /> iv. Details miscellaneous (up to 2 sheets) <br /> 12. The 30% design estimate will be a Class 3 (-20% to +30% accuracy range) prepared per <br /> AACE 18R-97. <br /> 13. A dewatering plan is not included in this scope of services. <br /> 14. Utility potholing is not included in this scope of services and will be part of a subsequent <br /> work phase. <br /> 15. BNSF crossing and WSDOT permit coordination and submittals are not included in the <br /> scope and will be part of a subsequent work phase. <br /> 16. Curb ramps (ADA and otherwise) and other ROW improvements are not included. If <br /> required, they will be added in subsequent design phases. <br /> Deliverables <br /> 1. Stormwater Conveyance Preliminary design (30%) drawings (PDF) <br /> 2. Preliminary 30% AACE Class 3 OPCC (PDF) <br /> 3. Meeting agenda and summary notes (PDF) <br /> Task 500 Stormwater Treatment Preliminary Design <br /> Objective <br /> Develop the preliminary design level stormwater treatment improvements based on the selected <br /> design alternative from the Lexington and Wetmore Storm Drainage and Water Treatment <br /> Improvements Feasibility Evaluation. The stormwater treatment preliminary design will provide <br /> treatment and flow control as outlined in Task 600. <br /> Consultant Services <br /> 1. Review the recent feasibility evaluation along with available treatment site and tributary <br /> subbasins runoff database. Information review will also include City GIS database, parcel/ <br /> ROW/easement boundaries for the treatment site and adjacent drainage systems, available <br /> surveyed and LiDAR topography, soils and prior geotechnical reports, critical areas and <br /> potential environmental constraints, prior hydrologic and hydraulic evaluations, and utility <br /> maps and locates. <br /> 2. Conduct project site field reconnaissance for up to four (4) staff of the project site and <br /> tributary drainage subbasin areas including subbasin areas proposed for CSS separation. <br /> Also review the proposed offline diversion of treatment flows to the site and existing and <br /> proposed downstream and storm drainage systems: <br /> Lexington Avenue Storm Drainage Improvements Preliminary Design Scope of Services <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.