My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc. 10/6/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
HDR Engineering Inc. 10/6/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 10:18:22 AM
Creation date
10/14/2022 10:16:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc.
Approval Date
10/6/2022
Council Approval Date
10/5/2022
End Date
12/31/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Drainage Improvements
Public Works WO Number
UT3792
Tracking Number
0003503
Total Compensation
$1,299,908.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A LL <br /> YZ <br /> a. Site review of the potential outfall locations on the Snohomish River, including <br /> conveyance alignment from the stormwater treatment facility and potential crossing <br /> locations for the WSDOT 1-5 and BNSF railroad crossings to the proposed Snohomish <br /> River outfall. <br /> b. Optional follow-up review of the selected outfall site and WSDOT 1-5 and BNSF crossing <br /> locations. <br /> c. Preparation of an outfall site conditions memorandum to document findings of the data <br /> review and site reconnaissance inclusive of data gaps and supplemental data needs for <br /> the project preliminary design. <br /> 3. Evaluate routing options and feasibility from the stormwater treatment facility to the potential <br /> outfall locations based on the results of the data review and field reconnaissance. <br /> 4. Prepare for and attend a meeting with City Staff for up to two (2) hours in duration. It is <br /> assumed that the meeting will be conducted via MS Teams (or other web-based virtual <br /> platform), and up to four (4) consultant staff may attend. The meeting will outline potential <br /> outfall options with associated conveyance alignment and WSDOT/BNSF crossing <br /> considerations: <br /> a. Prepare up to two exhibits on the proposed conveyance, routing, and outfall site to <br /> facilitate meeting discussions. <br /> Client Responsibilities <br /> 1. Schedule City staff participation in meetings and workshops included in the scope. <br /> 2. Complete review of meeting notes and decision log within 7 calendar days. After this time, <br /> the notes and decision logs will be finalized and archived as part of the project record. <br /> 3. Provide reviews, as needed, with one (1) set of consolidated (conflict resolved) comments <br /> on the draft technical memoranda within ten (10) business days of receiving draft submittal <br /> documents. <br /> Assumptions <br /> 1. Discharge will be in compliance with the City's municipal stormwater permit. <br /> 2. Survey of the river channel will not be required to develop the concept HEC-RAS modeling. <br /> 3. It is assumed that one hydraulic model will be provided for the selected outfall location, and <br /> additional hydraulic models will not be required for an alternative siting analysis or for an <br /> interim condition assessment. <br /> 4. Federal Emergency Management Agency applications and submittals will be addressed in a <br /> subsequent stage of design and are not included. <br /> Deliverables <br /> 1. Outfall Site Conditions Memorandum (PDF and Word files) <br /> 2. Meeting agenda and summary notes (PDF) <br /> Lexington Avenue Storm Drainage Improvements Preliminary Design Scope of Services <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.