Laserfiche WebLink
Exhibit B <br /> EXPENSES <br /> City of Everett: Lexington Avenue Storm Drainage Imp.Preliminary Design <br /> F3/ Mil 2022ma`a'(IRS Miscellaneous Trimble Unit/day Field Supplies a a <br /> -, + <br /> m c O a. <br /> Travel Miscellaneous Field Equipment Field Equipment a C O C <br /> O <br /> o - n O ry <br /> OTHER DIRECT COSTS ~ ci ' o 1- <br /> Each Each Each Each <br /> Unit Cost $0.625 $500.000 $26.000 $50.000 $3.70 0.00% 5.00% <br /> 200 Survey _ <br /> Quantity 200 0 0 0 0.00 <br /> Task Total $126.00 $0.00 $0.00 $0.00 $0.00 $0.00 $125.00 $6.25 $131.25 <br /> 300 Geotechnical <br /> Quantity 0 0 _ 0 0 _ 0.00 <br /> Task Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br /> 400 Conveyance System Predesign <br /> Quantity 200 1 0 0 0.00 <br /> Task Total $125.00 $600.00 $0.00 $0.00 $0.00 $0.00 $625.00 $31.25 $656.25 <br /> 9. 5001411111r water Treatment Predesign <br /> Quantity _ 200 _ 0 0 0 0.00 <br /> Task Total $126.00 $0.00 $0.00 $0.00 $0.00 $0.00 $125.00 $6.25 $131.26 <br /> l 600 Treated. SDischarge <br /> Quantity 400 1 1 40 0.00 <br /> Task Total $260.00 $500.00 $26.00 $2,000.00 $0.00 $0.00 $2,776.00 $138.80 $2,914.80 <br /> 700 Permitting la <br /> Quantity 800 0 0 0 0.00 <br /> Task Total $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $500.00 $25.00 $626.00 <br /> Total ODCII$ 1,125.00 If$ 1,000.0011$ 26.00 II$ 2,000.00 ID$ - 11$ - a $ 4,151.00 II$ 207.55 II$ 4,358.55 <br />